Cuba AI framework
Independent CAIA consultation proposal • 27 November 2026 · Revision 2
A photograph can show an intact façade while the household behind it still needs a repair. Use renovation, food supply and conservation cases to judge whether a system can accept observations made on the ground, correct its records and keep working when photographs or connections are missing.
Read the research Download the editable edition (Word)
Four decisions for Cuba
| Local priority | Decision the framework proposes |
|---|---|
| Economic | Reconcile one day’s sales and losses against the morning forecast before extending the trial. FAO Cuba, support for urban, suburban and family agriculture |
| Social | Publish the catalogue description only after checking its wording and permissions with contributors. UNESCO, La Tumba Francesa |
| Political and institutional | Give the resident the same case reference on the paper receipt and the electronic record. Gaceta Oficial No. 90, Law 149/2022, archived issue |
| Environmental | Show unverified locations separately and let field staff correct the mapped boundary. UNESCO Man and the Biosphere Programme, Ciénaga de Zapata |
Who acts first
Reconcile street photographs with household reports during a shadow trial in Old Havana.
Proposed lead. Local inspection supervisor and participating residents
What to measure. Missed interior damage, corrections to addresses and time to acknowledgement.
Test a grower’s short harvest forecast against sales records.
Proposed lead. Participating grower and market supervisor
What to measure. Forecast error in saleable units and minutes of rework.
How the five regional checks apply
- Infrastructure
- Ask residents and conservators to check images and local street names. Record whether a person can report damage in Spanish without uploading a photograph, disclosing a neighbour’s name or having reliable mobile data.
- Data and permissions
- Name the officer who authorises a visit or referral. A heritage repair estimate does not clear a courtyard for people to enter. Follow voice recordings from the municipal desk to the contractor and get separate authority for any speech training.
- Talent and local review
- Invite the local damage assessment lead to compare the output with local observations.
- Governance and suspension
- Name a person with authority to suspend the trial. Pause and review affected work if a resident’s report of hidden damage drops out of the inspection list.
- Adoption and public reporting
- Use the same case set and service channels for the current process and the trial. Publish completion, correction time and the decision to stop, revise or expand. Caribbean conservation offices could share a building-condition checklist. Keep household images, identifiable calls and decisions about occupancy with the authorities responsible in Cuba.
Local approval and regional cooperation
Caribbean conservation offices could share a building-condition checklist. Keep household images, identifiable calls and decisions about occupancy with the authorities responsible in Cuba.
Record the local approval, correction route and stop authority before exchanging results. Other jurisdictions can reuse the method and run their own tests. Regional recommendation 5.
Regional policy · Cuba legal and safety guidance · Regional risk register
Related sector guides: Transport, logistics and disaster response.
A 90-day plan for the first service
Reconcile street photographs with household reports during a shadow trial in Old Havana.
Proposed pilot lead. Local inspection supervisor and participating residents
Street images conceal housing damage on the inside
Failure to test. A draft inspection list skips an Old Havana household whose report gives credible evidence of damage unseen from the road.
Evidence to retain. Keep the resident’s recorded report, the officer’s comparison and the revised inspection status.
Pause condition. A resident with a reported hazard loses review priority based on images alone.
| When | Proposed action and evidence |
|---|---|
| Days 1–30 | Local inspection supervisor and participating residents agrees the eligible cases, existing service measures, staffed alternative and authorised decision owner. Record reviewers and a cost estimate in local currency for staff time, testing, access and recovery. Identify the funding source and who would approve it. |
| Days 31–60 | Run the original and proposed routes on the same sample. Missed interior damage, corrections to addresses and time to acknowledgement. Report counted errors and eligible cases by channel and language where lawful, plus the time from error report to correction. |
| Days 61–90 | Witness the fallback, correction and restart before asking the accountable officer for a decision. Pause on the condition above. Record affected cases, unresolved issues, costs and the date for the next check. |
| Six months after live launch | Publish a lawful comparison with the baseline, including corrections, open complaints and the decision to continue, change or end the use. |
Sponsorship, funding and the proposed lead’s acceptance require a recorded local decision. Share test methods with Caribbean partners using the local data permissions.
Sector guide · Gaceta Oficial No. 90, Law 149/2022, archived issue · Local evidence and sources · Regional high-impact use rules · Local risk scenario