Risk register
Framework home · Policy document
Each row describes an event that could affect a service and the harm it could cause. Tiers group events by the potential spread of harm and the uncertainty involved. The entries await assessment by the responsible service.
Independent CAIA consultation guidance. It does not establish legal duties, issue approvals or replace applicable law and permit conditions.
How to use the register
- Identify the service, people affected, conditions that could cause the event and the existing controls.
- Assess likelihood and impact before and after treatment using local evidence. Set an assessment period and record any uncertainty.
- Assign a risk owner and treatment owner. Record the decision, due date, status and next review. Reassess after a material change or incident.
Assess a local risk
Download the editable risk register (XLSX) · Download the scenario list (CSV) · Incident reporting and handoff
The workbook includes fields for current controls, inherent and residual assessments, treatment, ownership, status and review. Leave unknown values blank until there is evidence to assess them.
NIST enterprise risk register example · NIST guidance on identifying and estimating risk · NIST guidance on risk response · HM Treasury Orange Book, Annex 2 · NIST AI Risk Management Framework
Scenario research MIT AI Risk Repository · OECD incident monitor
Jump to a risk
- R01 Identity errors and impersonation
- R02 Sensitive data leaves its approved route
- R03 People accept a wrong AI answer
- R04 Fraud or unauthorised system changes
- R05 Service excludes people
- R06 Poor training creates hidden work
- R07 Cultural material is used without authority
- R08 Power demand strains the local grid
- R09 Cooling competes for water in dry periods
- R10 Local air, noise, heat or runoff affects neighbours
- R11 Flood or storm interrupts multiple services
- R12 Batteries and electronics lack a safe end route
- R13 Automation pressures pay and entry-level work
- R14 Skills leave faster than local roles grow
- R15 Foreign provider dependency defeats an exit
- R16 Political or supplier pressure distorts public decisions
- R17 Concentration weakens local economic and policy choices
- R18 Severe failure spreads across essential services
- R19 Advanced systems could escape effective oversight
- R20 Negation lost in a referral draft
- R21 Result units change during transfer
- R22 A delayed correction fails to reach the next team
- R23 A translated instruction changes the type of appointment
- R24 A documentation trial consumes urgent review time
- R25 Late data make a parish appear quiet
- R26 A chart carries instructions that a screen reader skips
- R27 Small-area numbers identify a patient
- R28 A help channel mistakes an accessibility request for refusal
- R29 A resource summary uses an expired clinic capacity report
- R30 A marking aid mistakes a dialect for a wrong answer
- R31 A research summary cites an article that cannot be located
- R32 A recorded learning need moves outside the authorised school team
- R33 An online-only task excludes learners with intermittent access
- R34 A model comparison reuses its test examples for tuning
- R35 A postcode substitutes for income evidence
- R36 A claim is assessed under the wrong contract edition
- R37 A similar name freezes the wrong account
- R38 A quote uses a rate from the wrong market or currency
- R39 Shared vendor failure blocks several claims channels
- R40 An unofficial election notice changes a polling instruction
- R41 A model treats missing records as grounds for refusing a benefit
- R42 A court date changes without passing through the official register
- R43 A biometric match is treated as identity evidence by itself
- R44 A translation shortens the stated appeal period
- R45 A public excerpt uses a voice beyond the agreed purpose
- R46 An archive tool reveals a restricted ceremony
- R47 An export loses attribution metadata
- R48 A classifier suppresses a local expression as abuse
- R49 Generated visuals carry rights the buyer cannot transfer
- R50 A cool-month model understates dry-season demand
- R51 A restart load falls outside the connection study
- R52 A facility’s emissions ledger omits backup generation
- R53 A replacement plan assumes disposal options that are unavailable
- R54 An optimisation draft ignores a sensor outage
- R55 An AI crop advisory uses the wrong planting zone
- R56 A message repeats an expired fishing boundary
- R57 A landing model compares incomparable catch weights
- R58 A precision irrigation suggestion omits salinity
- R59 A photograph alone sends a disease alert to growers
- R60 An automated refund answer ignores a storm closure
- R61 A price recommendation moves the decimal or currency
- R62 A directory advertises an entrance a disabled guest cannot use
- R63 A ranking buries locally verified retailers
- R64 A store treats customer contact as consent for a campaign
- R65 A support summary treats a disputed identity step as complete
- R66 An outage dashboard shows silence as restoration
- R67 A corrected alert fails to reach a carrier channel
- R68 A support classifier closes an accessibility grievance
- R69 A network expansion plan treats call volume as population need
- R70 A routing suggestion sends a vehicle towards a flooded crossing
- R71 A cargo summary assigns the wrong inspection status
- R72 An aid directory routes residents to an unusable shelter
- R73 A transshipment estimate hides a missed handoff
- R74 A shared transport feed interrupts several warning routes
- R75 A shift note marks an unresolved hazard as cleared
- R76 A rota optimisation leaves the only trained worker unavailable
- R77 A hiring tool filters applicants over a recorded accommodation
- R78 A score penalises work carried out away from the tracking tool
- R79 A system update removes the manual sign-off route
- R80 A ferry surge becomes a room forecast
- R81 A lagoon map removes a use that fishers rely on
- R82 A Papiamento notice sends someone to the wrong counter
- R83 A Family Island relief map shows a closed dock as open
- R84 A water forecast overlooks a leak reported by phone
- R85 A visitor assistant sends people to a reserve without permission
- R86 A summary changes the currency of a financial commitment
- R87 A handoff between counters resets a filing date
- R88 A clinic reminder requires travel to the wrong island
- R89 An assistance application restarts on another channel
- R90 A translated clinic reminder changes the appointment location
- R91 A forest alert draws an inspection away from verified change
- R92 Street images conceal housing damage on the inside
- R93 A Papiamentu service answer changes the action required
- R94 A remote damage assessment misses an affected farm asset
- R95 A tourism forecast applies national volume to local bookings
- R96 A reconstruction passes as a documented historical detail
- R97 A clinic books an interior appointment a patient cannot reach
- R98 A storm assessment undercounts bearing trees
- R99 A water notice gives the wrong service area
- R100 A lesson mistranslates a step pupils need to follow
- R101 A forest alert changes a village decision before field review
- R102 A Kreyòl warning loses its location during a power cut
- R103 A reserve change alert mixes observations from different dates
- R104 A spelling variation holds an eligible grant application
- R105 A catering buyer compares quantities that cannot be used alike
- R106 A visitor assistant leaves out active small operators
- R107 A passenger notice inherits the terms for cargo service
- R108 A fisheries record discloses restricted locations through an export
- R109 A provisional booking becomes a confirmed sailing notice
- R110 Two language versions ask for different documents
- R111 A Fort Bay cargo instruction survives a correction in an old thread
- R112 A water estimate assumes production during planned maintenance
- R113 A shared allocation model merges two islands’ water records
- R114 A radio notice changes the action although the place name is right
- R115 A school notice gives families different collection entrances
- R116 An inter-island appointment requires an impossible journey
- R117 A release summary matches the wrong consignee
- R118 An earlier housing assessment hides a resident’s new evidence
- R119 An assessment marks a correct local-language explanation wrong
- R120 An archive permission for a recording reaches the wrong use
- R121 An island staffing forecast pools unlike shifts
- R122 A ferry change reaches the web but misses the terminal
- R123 A landing summary applies the wrong unit before a payment
Find a risk
| Risk | Risk event | Potential consequence | Sector and jurisdiction | Proposed owner | Response and evidence |
|---|---|---|---|---|---|
| R01Identity errors and impersonation | A service accepts an impersonator or matches a sensitive record to the wrong person. | The wrong person could receive money, gain access or learn private information. | Cross-sector Regional example Operational | Service manager | Confirm identity using the organisation’s existing process; give the person a correction route. Evidence and stop trigger
|
| R02Sensitive data leaves its approved route | A prompt, file, log or export carries sensitive data outside its approved storage, use or recipients. | Affected people could lose privacy or control of their records. | Cross-sector Regional example Operational | Privacy officer | Map the data route; minimise information and verify permissions with the supplier. Evidence and stop trigger
|
| R03People accept a wrong AI answer | A reviewer acts on an incorrect model answer without confirming it against the source. | A false conclusion could change a decision and require correction. | Cross-sector Regional example Operational | Quality lead | Give reviewers time, source access and authority to correct the outcome. Evidence and stop trigger
|
| R04Fraud or unauthorised system changes | An agent or impersonator makes a consequential change without the required approval. | Records, payments or system access could change before staff can intervene. | Cross-sector Regional example Operational | Security lead | Keep approvals in the existing system; restrict permissions and rehearse incident response. Evidence and stop trigger
|
| R05Service excludes people | A person cannot finish a required task through the available language, device or accessible channel. | The person could lose a service, benefit or opportunity to appeal. | Cross-sector Regional example Operational | Service owner | Repair the failure and retain a staffed alternative. Evidence and stop trigger
|
| R06Poor training creates hidden work | Staff miss material errors after release because training tested attendance or recall in place of the actual task. | Review queues and correction time could grow even if drafting becomes faster. | Cross-sector Regional example Operational | Training lead | Provide paid task practice using approved records and feedback from a supervisor. Evidence and stop trigger
|
| R07Cultural material is used without authority | A service reuses a voice, recording or culturally restricted item outside the permission granted. | Creators or communities could lose control of the material and face wider reuse. | Cross-sector Regional example Operational | Archive or rights lead | Consult the relevant rights holder or custodian, agree compensation where applicable and log permitted reuse. Evidence and stop trigger
|
| R08Power demand strains the local grid | A facility draws more power at peak than the utility agreed or its backup can carry. | The utility could face interruptions or unplanned capacity costs. | Cross-sector Regional example Facility / community | Utility liaison | Compare scope, connection and staged options using the same workload. Evidence and stop trigger
|
| R09Cooling competes for water in dry periods | Cooling demand draws beyond the permitted dry-period supply. | Residents, farms or other users could have less water available. | Cross-sector Regional example Facility / community | Facility water lead | Check alternate designs, named water sources, storage and shortage priority. Evidence and stop trigger
|
| R10Local air, noise, heat or runoff affects neighbours | Operations send noise, heat, polluted air or runoff past the approved site boundary. | Nearby communities or habitats could experience harm that requires a remedy. | Cross-sector Regional example Facility / community | Environmental manager | Check generator use, cooling and drainage conditions. Publish the monitoring route. Evidence and stop trigger
|
| R11Flood or storm interrupts multiple services | A storm disables the main and backup service through a shared feeder, fibre route or access road. | People could lose communications or essential services during recovery. | Cross-sector Regional example Facility / community | Continuity lead | Test fallback with affected agencies and retain independent access where feasible. Evidence and stop trigger
|
| R12Batteries and electronics lack a safe end route | Retired batteries or equipment accumulate or move outside the documented disposal route. | Unsafe handling could expose workers, data or the environment. | Cross-sector Regional example Facility / community | Facilities and waste lead | Separate waste streams through qualified operators and verify approvals, reuse or final disposal. Evidence and stop trigger
|
| R13Automation pressures pay and entry-level work | An automation programme reduces entry-level work and shifts checking or overtime to staff. | Workers could lose income, supported practice or a route into skilled roles. | Cross-sector Regional example Regional / structural | Employer and worker representatives | Agree where time saved goes and protect paid pathways into more responsible roles. Evidence and stop trigger
|
| R14Skills leave faster than local roles grow | A service loses skilled workers before it can train or retain replacements. | A team could become unable to operate, review or change its own system. | Cross-sector Regional example Regional / structural | Workforce programme lead | Fund placements, mentoring and local handover. Track jobs that persist after the contract. Evidence and stop trigger
|
| R15Foreign provider dependency defeats an exit | A supplier exit test cannot restore usable records or keep the service available. | The operator could face lost records, service disruption or unplanned switching costs. | Cross-sector Regional example Regional / structural | Procurement authority | Retain portable exports, document dependencies and compare a priced fallback. Evidence and stop trigger
|
| R16Political or supplier pressure distorts public decisions | Political or supplier influence changes an eligibility rule, tender or access decision outside the approved process. | People could lose fair access and the reasons for the decision could become hard to trace. | Cross-sector Regional example Regional / structural | Public procurement chair | Write criteria in advance, disclose interests and record reasons with lawful redaction. Evidence and stop trigger
|
| R17Concentration weakens local economic and policy choices | Several organisations adopt one underlying provider and find they cannot use an independent alternative. | Shared outages and switching costs could limit choice across the region. | Cross-sector Regional example Systemic | National finance and digital leads | Share approved evidence across countries; reserve local approval and record which costs and capabilities stay local. Evidence and stop trigger
|
| R18Severe failure spreads across essential services | A failure in a shared identity, data or hosting service interrupts several essential services. | Separate operators could lose service at the same time and compete for limited recovery capacity. | Cross-sector Regional example Systemic | National incident coordination lead | Run a joint continuity drill and name a decision-maker in each service. Evidence and stop trigger
|
| R19Advanced systems could escape effective oversight | An advanced system continues consequential actions after operators lose reliable oversight or the ability to stop it. | Harm could grow across affected services while operators work to regain control. | Cross-sector Regional example Frontier uncertainty | National oversight authority or designated public sponsor | Use independent evaluation, narrow authority and documented human stop controls before any consequential use. Evidence and stop trigger
|
| R20Negation lost in a referral draft | A draft referral changes a negative finding into a positive finding and could alter the care queue. | A qualified team could put a patient in the wrong care queue. | Health and clinical care Sector example Operational | Clinical safety lead | A qualified reviewer compares each consequential statement with the signed source before sending it. Evidence and stop trigger
|
| R21Result units change during transfer | A reading is copied into a clinical note with a different unit or reference interval. | The receiving team could interpret a result against the wrong clinical threshold. | Health and clinical care Sector example Operational | Clinical safety lead | Display the original result and unit beside the draft and have authorised staff resolve every mismatch. Evidence and stop trigger
|
| R22A delayed correction fails to reach the next team | The source record changes and an earlier summary remains in the handover queue. | A later decision could rely on a finding the source team already corrected. | Health and clinical care Sector example Operational | Clinical records lead | Attach record version and time to summaries and recall every affected copy after a material correction. Evidence and stop trigger
|
| R23A translated instruction changes the type of appointment | A text prepared in the patient’s preferred language reverses whether they should attend in person. | A patient could miss an appointment or travel unnecessarily. | Health and clinical care Sector example Operational | Clinic operations lead | Have authorised staff and a competent speaker check the original and translated actions on matched cases. Evidence and stop trigger
|
| R24A documentation trial consumes urgent review time | A typing aid saves drafting time and creates a review backlog that delays urgent cases. | Urgent work could wait longer than the agreed clinical limit. | Health and clinical care Sector example Facility / community | Clinical service director | Measure the whole pathway including corrections and keep urgent work in the staffed priority queue. Evidence and stop trigger
|
| R25Late data make a parish appear quiet | A dashboard labels a district low priority after reports from a local clinic arrive late. | A district that needs attention could be skipped when resources are assigned. | Public health and disability access Sector example Facility / community | Surveillance lead | Show reporting completeness by district and require a duty officer to examine flagged missing returns. Evidence and stop trigger
|
| R26A chart carries instructions that a screen reader skips | An emergency information graphic includes action text with no accessible equivalent. | A resident using a screen reader could miss an essential instruction. | Public health and disability access Sector example Facility / community | Public communications lead | Provide a text and staffed route and have affected users complete the same task on each route. Evidence and stop trigger
|
| R27Small-area numbers identify a patient | A summary combines a location and rare condition with other fields a reader can use to identify someone. | A reader could link a sensitive condition to an identifiable person. | Public health and disability access Sector example Facility / community | Disclosure review lead | Use a qualified disclosure review before release, aggregate where appropriate and keep restricted records inside the service. Evidence and stop trigger
|
| R28A help channel mistakes an accessibility request for refusal | A public enrolment interface treats a request for an interpreter as an abandoned or rejected application. | An applicant could lose a deadline, place in the queue or entitlement. | Public health and disability access Sector example Operational | Disability access lead | Let users choose a staffed route while preserving the original application date. Evidence and stop trigger
|
| R29A resource summary uses an expired clinic capacity report | A public directory directs someone to a site whose operating hours or capacity has changed. | A resident could spend time and money travelling to an unavailable service. | Public health and disability access Sector example Facility / community | Public health operations lead | Date each source and provide an authorised way for clinic staff to correct availability across channels. Evidence and stop trigger
|
| R30A marking aid mistakes a dialect for a wrong answer | A grader lowers an otherwise correct answer because a local phrasing differs from the examples it expects. | A pupil could receive a lower grade for using an accepted language variety. | Education and research Sector example Operational | Assessment lead | Accept locally supported variants and require teacher review before recorded grades change. Evidence and stop trigger
|
| R31A research summary cites an article that cannot be located | A generated background section presents fabricated or mismatched citations as evidence. | A research decision or publication could rely on a finding with no traceable source. | Education and research Sector example Operational | Research integrity lead | Open each cited work and trace the claim to a page, table or result before circulating the paper. Evidence and stop trigger
|
| R32A recorded learning need moves outside the authorised school team | A tutoring report includes a support need that a supplier or external group is not authorised to receive. | An unauthorised recipient could learn a pupil’s learning support needs. | Education and research Sector example Operational | School administrator | Use the school’s approved records route and omit identifiers from tool trials. Evidence and stop trigger
|
| R33An online-only task excludes learners with intermittent access | A new assessment depends on online assistance and students with weak access cannot show their work. | A learner could lose marks or miss a submission because of unreliable access. | Education and research Sector example Operational | Teacher or course coordinator | Compare equivalent offline and online tasks and keep an independently approved submission route. Evidence and stop trigger
|
| R34A model comparison reuses its test examples for tuning | The same examples guide revisions and appear in the score used to justify performance. | Reported performance could overstate how well the tool works on new cases. | Education and research Sector example Operational | Research data steward | Freeze a separate test set and document data lineage and review exceptions before submitting a result. Evidence and stop trigger
|
| R35A postcode substitutes for income evidence | A screening aid uses location as a proxy when a borrower has incomplete address or income records. | A borrower could receive worse terms or lose credit without a sound reason. | Finance and insurance Sector example Operational | Credit policy lead | Test alternative records and require a reasoned staff decision before a decline. Evidence and stop trigger
|
| R36A claim is assessed under the wrong contract edition | A tool retrieves today’s wording for a loss governed by an earlier policy. | A claimant could face an incorrect refusal, payment or delay. | Finance and insurance Sector example Operational | Claims supervisor | Compare coverage with the dated policy in force for the case and require the handler to attest the source. Evidence and stop trigger
|
| R37A similar name freezes the wrong account | A triage flag links a customer with a different person and moves the case towards a restriction. | A customer could lose legitimate access to funds while the firm corrects the match. | Finance and insurance Sector example Operational | Financial crime review lead | Require approved identity evidence and an authorised reviewer before an adverse action. Evidence and stop trigger
|
| R38A quote uses a rate from the wrong market or currency | A summary mixes product rates across markets and an applicant treats it as a binding quote. | A customer could commit to a price or currency the provider cannot honour. | Finance and insurance Sector example Operational | Product and conduct lead | Show dated rate source, market, currency and the approval status before issuing a quote. Evidence and stop trigger
|
| R39Shared vendor failure blocks several claims channels | A cloud or identity dependency used by multiple financial firms fails during a surge in claims. | Claimants could have trouble submitting urgent claims or tracking whether requests were received. | Finance and insurance Sector example Systemic | Continuity lead | Rehearse an independent intake route and restore sample claims without sharing applicant records across firms. Evidence and stop trigger
|
| R40An unofficial election notice changes a polling instruction | A generated message looks authoritative but states the wrong time, location or eligibility requirement. | A voter could go to the wrong location or miss the time to vote. | Public administration and justice Sector example Facility / community | Public information officer | Link public instructions to the electoral authority’s current notice and rehearse a correction across channels. Evidence and stop trigger
|
| R41A model treats missing records as grounds for refusing a benefit | A case with incomplete data bypasses statutory review or the applicant’s opportunity to supply evidence. | An eligible person could lose a benefit or time to provide evidence. | Public administration and justice Sector example Operational | Benefits operations lead | Require a caseworker’s reason, notice and human reconsideration before adverse decisions. Evidence and stop trigger
|
| R42A court date changes without passing through the official register | A scheduling draft blends dates for similar case numbers and tells someone to attend at the wrong time. | A person could miss a hearing or face an avoidable procedural penalty. | Public administration and justice Sector example Operational | Registry supervisor | Check notices against the authoritative docket and log each amended message and acknowledgement. Evidence and stop trigger
|
| R43A biometric match is treated as identity evidence by itself | An operator gives an automated match more authority than the local approval and independent record allow. | An incorrect identity match could prompt a restriction or denial. | Public administration and justice Sector example Facility / community | Authorising officer and rights reviewer | Require legal clearance, independent identity evidence and a review path for individuals before use. Evidence and stop trigger
|
| R44A translation shortens the stated appeal period | A bilingual public notice gives a different deadline in one version. | A person could lose time to challenge an adverse decision. | Public administration and justice Sector example Operational | Appeals service lead | Have qualified reviewers compare all operative dates and provide a staffed correction channel. Evidence and stop trigger
|
| R45A public excerpt uses a voice beyond the agreed purpose | Material cleared for archiving appears in a promotional work with a recognisable voice. | A person’s voice could circulate in a use they did not authorise. | Culture and creative rights Sector example Facility / community | Rights and licensing lead | Record distinct permission for excerpting, imitation, reuse and audience, and ask rights holders to review it. Evidence and stop trigger
|
| R46An archive tool reveals a restricted ceremony | A search response summarises community material whose location or content custodians restrict. | People outside the community could obtain restricted cultural information. | Culture and creative rights Sector example Facility / community | Archive custodian | Use collection-level access permissions and have designated custodians review public results. Evidence and stop trigger
|
| R47An export loses attribution metadata | A distribution tool drops composer, performer or photographer credits from a revised asset. | Creators could lose attribution or evidence needed to resolve a rights dispute. | Culture and creative rights Sector example Operational | Production editor | Reconcile required credits and rights metadata before each publication and vendor handoff. Evidence and stop trigger
|
| R48A classifier suppresses a local expression as abuse | People who use an established cultural phrase lose access to a forum after automated moderation. | Members of a language community could lose access or have their speech suppressed. | Culture and creative rights Sector example Facility / community | Platform moderation lead | Have qualified reviewers check context, provide appeal and measure reinstatements by language where lawful. Evidence and stop trigger
|
| R49Generated visuals carry rights the buyer cannot transfer | A contractor supplies artwork for a use that its records or licences do not establish. | A publisher could face a rights claim or have to withdraw material. | Culture and creative rights Sector example Operational | Creative procurement lead | Check the rights chain and permitted distribution before using the asset, and keep a replacement route. Evidence and stop trigger
|
| R50A cool-month model understates dry-season demand | A cooling estimate uses normal temperatures and supply while restrictions apply during the dry period. | Dry-period water supply could fall short for local users or the facility. | Energy, water and data centres Sector example Facility / community | Facility water lead | Compare withdrawal, consumption and source limits under hot, dry conditions with utility review. Evidence and stop trigger
|
| R51A restart load falls outside the connection study | A facility asks for capacity on steady-state measurements and omits a coincident restart peak. | A restart could strain the local connection or interrupt another service. | Energy, water and data centres Sector example Facility / community | Utility liaison | Require study of restart and sustained operation at the site before agreeing a load. Evidence and stop trigger
|
| R52A facility’s emissions ledger omits backup generation | A review attributes energy to the grid and omits emergency generators or onsite fuel use. | A project could understate its emissions and choose a design on incomplete evidence. | Energy, water and data centres Sector example Facility / community | Environmental manager | Reconcile meter and fuel records by operating state before comparing alternatives. Evidence and stop trigger
|
| R53A replacement plan assumes disposal options that are unavailable | End-of-life equipment accumulates when the planned recycler or exit route cannot take it. | Old equipment could accumulate without a suitable storage or treatment route. | Energy, water and data centres Sector example Facility / community | Facilities and waste lead | Verify approved storage, transport and treatment routes and budget their full cost. Evidence and stop trigger
|
| R54An optimisation draft ignores a sensor outage | A planned action uses a flat reading from a sensor that stopped updating. | Operators could send work or release supply based on a reading that has stopped updating. | Energy, water and data centres Sector example Facility / community | Water operations controller | Check the age and reasonableness of measurements and keep manual dispatch available. Evidence and stop trigger
|
| R55An AI crop advisory uses the wrong planting zone | A weather or soil recommendation applies records from a different district or season. | A grower could spend money or commit a planting to unsuitable conditions. | Agriculture and fisheries Sector example Facility / community | Extension service lead | Have a local extension officer validate site, conditions, crop and date before release. Evidence and stop trigger
FAO guide to digital agricultural extension and advisory services |
| R56A message repeats an expired fishing boundary | A draft alert uses an earlier fishing zone or season after a competent authority updates it. | Fishers could take a trip into a restricted area or during a closure. | Agriculture and fisheries Sector example Facility / community | Fisheries information lead | Check current official map and dates and issue corrections on the same channels. Evidence and stop trigger
|
| R57A landing model compares incomparable catch weights | A tool merges landed whole fish and processed weights in one measure used for planning. | An official statistic or cooperative settlement could use an incorrect total. | Agriculture and fisheries Sector example Operational | Cooperative records lead | Record the unit and handling stage throughout collection and confirm anomalies with workers. Evidence and stop trigger
|
| R58A precision irrigation suggestion omits salinity | A model treats an available water source as usable without measurements that matter to the crop. | Growers could use unsuitable water and damage soil or crops. | Agriculture and fisheries Sector example Facility / community | Agricultural water adviser | Have the local agronomy and water teams check soil and source measurements before publishing advice. Evidence and stop trigger
FAO guide to digital agricultural extension and advisory services |
| R59A photograph alone sends a disease alert to growers | A classifier gives a confident label for a poorly observed crop symptom. | A grower could face an avoidable restriction, treatment expense or lost sales. | Agriculture and fisheries Sector example Facility / community | Biosecurity programme lead | Keep the result as a prompt for authorised review and confirm the observation before issuing a public instruction. Evidence and stop trigger
FAO guide to digital agricultural extension and advisory services |
| R60An automated refund answer ignores a storm closure | A booking assistant uses routine terms after an approved closure changes the conditions. | A traveller could lose a refund available under the approved closure terms. | Tourism, retail and small businesses Sector example Operational | Customer operations manager | Check the dated booking terms and closure policy and keep staffed refund review available. Evidence and stop trigger
|
| R61A price recommendation moves the decimal or currency | A draft offer combines tax or currency information from different islands and is sent to guests or customers. | A customer could accept an order at the wrong price or in the wrong currency. | Tourism, retail and small businesses Sector example Operational | Pricing owner | Require staff approval with amount, market, currency and total shown together. Evidence and stop trigger
|
| R62A directory advertises an entrance a disabled guest cannot use | A listing inherits generic accessibility text for a venue with different facilities. | A guest could arrive and find the advertised entrance unusable. | Tourism, retail and small businesses Sector example Operational | Accessibility and service lead | Verify access features with the operator and give guests a staffed verification route. Evidence and stop trigger
|
| R63A ranking buries locally verified retailers | A search assistant drops active independent shops because they lack records from a major booking or retail platform. | Local retailers could lose discoverability or bookings for reasons unrelated to eligibility. | Tourism, retail and small businesses Sector example Facility / community | Marketplace service owner | Audit eligibility by source and give businesses a way to correct their listing and challenge an exclusion. Evidence and stop trigger
|
| R64A store treats customer contact as consent for a campaign | A marketing draft includes contacts collected for deliveries or receipts without checking the permitted purpose. | Customers could receive marketing they did not authorise and face difficulty stopping it. | Tourism, retail and small businesses Sector example Operational | Marketing and privacy lead | Verify the actual use permission and maintain an accessible withdrawal route before sending. Evidence and stop trigger
|
| R65A support summary treats a disputed identity step as complete | A service tool clears a change request even though proof required by the carrier remains unresolved. | A subscriber’s service or account could change before the carrier verifies authority. | Telecommunications Sector example Operational | Subscriber services lead | Keep the validated identity and approval steps in the existing service flow and review exceptions. Evidence and stop trigger
|
| R66An outage dashboard shows silence as restoration | An area with damaged links stops sending reports and the dashboard interprets the gap as restored service. | A district could remain without service after responders stand down. | Telecommunications Sector example Facility / community | Network continuity lead | Mark missing data, collect independent field reports and keep contested conditions visible. Evidence and stop trigger
|
| R67A corrected alert fails to reach a carrier channel | An authorised emergency update replaces a draft on one route while another channel still sends the original. | Residents could act on an outdated emergency instruction. | Telecommunications Sector example Facility / community | Emergency communications lead | Reconcile updates with authorised systems and measure the time to withdraw stale information. Evidence and stop trigger
|
| R68A support classifier closes an accessibility grievance | A call transcript misclassifies a request from a customer who needs an alternative contact route. | A customer could lose access to a remedy or a usable contact channel. | Telecommunications Sector example Operational | Complaints service lead | Provide accessible channels and require a human check for possible unmet access needs. Evidence and stop trigger
|
| R69A network expansion plan treats call volume as population need | Planning data underweights places whose weak service yields few calls. | An area with unmet demand could lose priority for network investment. | Telecommunications Sector example Facility / community | Coverage programme lead | Compare recorded demand with field surveys and community reports before recommending investment. Evidence and stop trigger
|
| R70A routing suggestion sends a vehicle towards a flooded crossing | A route uses an old navigation layer after live authorities close a crossing. | A driver and passengers could reach a hazardous crossing or lose time finding another route. | Transport, logistics and disaster response Sector example Facility / community | Route operations lead | Confirm access with the authorised current source and maintain human dispatch on the emergency route. Evidence and stop trigger
|
| R71A cargo summary assigns the wrong inspection status | A draft combines records for similar shipments and reports a release that an authority has not cleared. | Cargo could move before the responsible authority has cleared it. | Transport, logistics and disaster response Sector example Operational | Port operations lead | Link to the authoritative record and require sign-off from the authorised officer. Evidence and stop trigger
|
| R72An aid directory routes residents to an unusable shelter | The model lists a site as open or accessible even though its current capacity or access has changed. | A resident could travel during a hazard to a shelter they cannot use. | Transport, logistics and disaster response Sector example Facility / community | Emergency shelter coordinator | Check current opening, routes and access with local coordinators and give a staffed route for corrections. Evidence and stop trigger
|
| R73A transshipment estimate hides a missed handoff | An operator relies on a predicted load window that omits a confirmed delay at the next port. | An operator could miss a connection or make a delivery promise it cannot keep. | Transport, logistics and disaster response Sector example Facility / community | Freight operations lead | Use confirmed dates for decisions that affect commitments and escalate missing handoffs. Evidence and stop trigger
|
| R74A shared transport feed interrupts several warning routes | An authoritative transport feed fails and multiple islands’ tools continue circulating a stale answer. | Several places could receive stale directions at the same time. | Transport, logistics and disaster response Sector example Systemic | Regional continuity coordinator | Trace shared dependencies and test distinct fallback sources with each participating authority. Evidence and stop trigger
|
| R75A shift note marks an unresolved hazard as cleared | A handover draft removes a warning because the prior note says a repair was planned. | A crew could start work before an unresolved hazard has been corrected. | Industry and workforce Sector example Operational | Safety supervisor | Have both shifts check unresolved hazards against the signed log before accepting the summary. Evidence and stop trigger
|
| R76A rota optimisation leaves the only trained worker unavailable | A schedule reduces hours while omitting a competency or cover requirement for the shift. | An operation could run without required skills or delay a shift until staff arrive. | Industry and workforce Sector example Operational | Workforce planning lead | Require staffing and competency sign-off and check absence and surge cases. Evidence and stop trigger
|
| R77A hiring tool filters applicants over a recorded accommodation | A model treats a request for more time or another channel as weak performance. | A qualified applicant could lose consideration because they requested access support. | Industry and workforce Sector example Operational | People and employment lead | Review job relevance of each input and offer accessible human reconsideration before rejection. Evidence and stop trigger
|
| R78A score penalises work carried out away from the tracking tool | A productivity model misses maintenance, training, or offline work and sends a misleading performance score to a manager. | A worker could face an adverse decision based on incomplete observation of their duties. | Industry and workforce Sector example Operational | Worker relations lead | Compare scores with the actual duties and have worker representatives review evidence and remedies. Evidence and stop trigger
|
| R79A system update removes the manual sign-off route | An update makes the authorised offline procedure unavailable when an industrial tool is down. | An operator could lose the authorised way to approve critical work during an outage. | Industry and workforce Sector example Facility / community | Operational continuity lead | Rehearse version changes and show that supervisors can complete critical approvals without the tool. Evidence and stop trigger
|
| R80A ferry surge becomes a room forecast | A visitor bulletin merges day trips and overnight stays and changes expected demand for guesthouses. | A guesthouse could buy stock or schedule staff for bookings that do not follow. | Tourism, retail and small businesses Anguilla Operational | Tourism statistics editor | Test a draft visitor bulletin on months when ferry excursions and overnight stays moved differently. Evidence and stop trigger
|
| R81A lagoon map removes a use that fishers rely on | A draft planning layer marks a surveyed area unused even though fishers or a field team supplied contrary observations. | A planning decision could restrict a fishing use that field evidence would have identified. | Agriculture and fisheries Antigua and Barbuda Operational | Proposed coastal planning lead and invited Barbudan reviewers | Compare an annotated lagoon map with a field visit before releasing a planning layer. Evidence and stop trigger
Ramsar Sites Information Service, Codrington Lagoon site record |
| R82A Papiamento notice sends someone to the wrong counter | An appointment message changes the time, location or documents that a resident needs. | A resident could go to the wrong counter or miss the documents needed for an appointment. | Public administration and justice Aruba Operational | Public service counter supervisor | Test Papiamento appointment messages with local service users. Evidence and stop trigger
|
| R83A Family Island relief map shows a closed dock as open | A map combines an old photograph with a current alert and sends responders to a landing they cannot use. | Responders could lose time or attempt to use an unsafe landing. | Transport, logistics and disaster response The Bahamas Operational | Participating island emergency coordinator | Test a relief map on one Family Island using a paper copy and dated responder observations. Evidence and stop trigger
IDB and ECLAC, Assessment of the Effects and Impacts of Hurricane Dorian in The Bahamas |
| R84A water forecast overlooks a leak reported by phone | A metered route appears stable because a call-centre report has not entered the forecast data. | Operators could allocate water on a forecast that overlooks a known local loss. | Energy, water and data centres Barbados Operational | Participating water operations manager | Run a shadow forecast on a metered water route without changing allocations. Evidence and stop trigger
Barbados Water Authority, Climate Resilient South Coast Water Reclamation Project |
| R85A visitor assistant sends people to a reserve without permission | The assistant recommends access that a reserve manager or community guide has withheld. | Visitors could enter a site without permission and affect local managers or restricted areas. | Tourism, retail and small businesses Belize Operational | Participating tourism office and site managers | Review a sample of suggested visitor stops with local guides and reserve managers. Evidence and stop trigger
Belize Ministry of Tourism, National Sustainable Tourism Master Plan |
| R86A summary changes the currency of a financial commitment | An AI summary mismatches a date, currency or term from a closed financial file. | A reviewer or client could interpret the size or terms of a commitment incorrectly. | Finance and insurance Bermuda Operational | Participating firm’s review lead | Run a blind comparison of AI summaries and reviewer notes on closed financial files. Evidence and stop trigger
Government of Bermuda, Bermuda’s Economic and Employment Drivers |
| R87A handoff between counters resets a filing date | An application reaches the wrong office or loses its original timestamp when the case moves. | An applicant could miss a deadline even though the first counter received the case on time. | Public administration and justice Bonaire Operational | Participating service supervisors | Test a lost application moving between an island counter and an RCN unit. Evidence and stop trigger
Government of the Netherlands, Governance of Bonaire, St Eustatius and Saba |
| R88A clinic reminder requires travel to the wrong island | An appointment draft picks the wrong facility because a clinic name occurs in more than one service list. | A patient could pay for an avoidable journey or miss care. | Health and clinical care British Virgin Islands Operational | Community clinic scheduling lead | Check appointment reminders with a clerk on each participating island. Evidence and stop trigger
|
| R89An assistance application restarts on another channel | An online draft asks for evidence already received at a counter and the applicant loses their place. | An applicant could have to refile or lose their place in the assistance queue. | Public administration and justice Cayman Islands Operational | Financial assistance operations manager | Trial the same assistance case by email, at a counter and through the portal. Evidence and stop trigger
Cayman Islands Government, Applying to the Department of Financial Assistance |
| R90A translated clinic reminder changes the appointment location | A reminder in Palenquero changes a place or time that a reviewer must check before delivery. | A person could miss care or travel to the wrong clinic. | Health and clinical care Colombia Operational | Clinic service manager and participating speakers | Test appointment reminders with Palenquero speakers before automated delivery. Evidence and stop trigger
|
| R91A forest alert draws an inspection away from verified change | The system promotes a clearing without dated observations to establish the location or event. | Field staff could delay inspecting a change already confirmed elsewhere. | Agriculture and fisheries Costa Rica Operational | Conservation-area coordinator and authorised local reviewers | Test forest alerts against dated field observations before assigning an inspection. Evidence and stop trigger
|
| R92Street images conceal housing damage on the inside | A draft inspection list skips an Old Havana household whose report gives credible evidence of damage unseen from the road. | A household reporting a credible hazard could wait longer for an inspection. | Public administration and justice Cuba Operational | Local inspection supervisor and participating residents | Reconcile street photographs with household reports during a shadow trial in Old Havana. Evidence and stop trigger
|
| R93A Papiamentu service answer changes the action required | A proposed public service answer uses local wording fluently but tells a resident to take the wrong action. | A resident could follow the wrong instruction or miss a service date. | Public administration and justice Curaçao Operational | Public information editor and participating language reviewers | Test a Papiamentu service answer through initial request and correction. Evidence and stop trigger
|
| R94A remote damage assessment misses an affected farm asset | A photo-based review marks an agricultural asset intact despite paired farmer and extension observations. | A farmer could lose the chance to have a verified loss reviewed for recovery support. | Agriculture and fisheries Dominica Operational | Participating agricultural extension supervisor | Compare remote assessments with paired farmer and extension-officer observations. Evidence and stop trigger
|
| R95A tourism forecast applies national volume to local bookings | A forecast applies a region or unit that differs from the service operator’s actual market. | An operator could buy supplies or assign staff against demand outside their market. | Tourism, retail and small businesses Dominican Republic Operational | Participating operator and its booking supervisor | Check the units and geography behind local tourism forecasts. Evidence and stop trigger
Banco Central de la República Dominicana, tourism statistics |
| R96A reconstruction passes as a documented historical detail | A classroom aid presents an inferred feature as part of the historical record. | Pupils could learn an inference as fact and lose the distinction between evidence and reconstruction. | Education and research El Salvador Operational | Participating teacher and heritage reviewer | Run a classroom test using labelled reconstructions of the same object. Evidence and stop trigger
|
| R97A clinic books an interior appointment a patient cannot reach | The booking assistant offers a time that conflicts with available transport from an interior community. | A patient in an interior community could lose a time slot they have no route to reach. | Health and clinical care French Guiana Operational | Participating booking supervisor and interior care-centre staff | Rebook a sample of interior appointments with the normal transport arrangements recorded. Evidence and stop trigger
ARS Guyane and INSEE, Access to care across French Guiana, 2017 |
| R98A storm assessment undercounts bearing trees | A photograph-based estimate overlooks damage to bearing nutmeg or cocoa trees seen on inspection. | Growers could have eligible losses omitted from a recovery decision. | Agriculture and fisheries Grenada Operational | Participating extension officer and growers | Compare a sample of storm-damage estimates with inspections of bearing nutmeg and cocoa trees. Evidence and stop trigger
Government of Grenada, Second National Communication, Carriacou marine protected area |
| R99A water notice gives the wrong service area | A notice confuses Marie-Galante with another service zone or repeats an instruction that expired. | Households could plan around a water notice for another supply area or date. | Energy, water and data centres Guadeloupe Operational | Local water-service desks and a participating municipal communications officer | Read sample water notices aloud to residents of Marie-Galante and the main islands. Evidence and stop trigger
|
| R100A lesson mistranslates a step pupils need to follow | An AI lesson changes an action in a language variety used by the class. | Pupils could miss a learning step because the tool changed the action in their language. | Education and research Guatemala Operational | Classroom teacher and participating language reviewer | Have pupils carry out locally reviewed instructions before distributing an AI lesson. Evidence and stop trigger
Government of Guatemala, National Day of Indigenous Languages |
| R101A forest alert changes a village decision before field review | A remote change flag enters a village report while the location or apparent change remains disputed. | A village could face a changed payment or public map before its authorised field review. | Agriculture and fisheries Guyana Operational | Participating village reviewers and forest monitoring officer | Review a sample of remote change alerts with willing village representatives. Evidence and stop trigger
Government of Guyana, Biennial Transparency Report, national forest monitoring system |
| R102A Kreyòl warning loses its location during a power cut | A warning replay on radio or a staffed relay omits where the listener should act. | A listener could take the correct action at an unsafe or unintended location. | Transport, logistics and disaster response Haiti Operational | Participating local civil protection lead and radio editor | Run a short Haitian Creole warning drill with the power disconnected at the receiving site. Evidence and stop trigger
World Meteorological Organization, CREWS Haiti support for the Hydrometeorological Unit |
| R103A reserve change alert mixes observations from different dates | A draft layer pairs unsuitable image dates and labels seasonal variation as unauthorised change. | A disputed satellite alert could cause the wrong site to be inspected or restricted. | Agriculture and fisheries Honduras Operational | Reserve monitoring lead and participating community reviewers | Test change alerts using image pairs and authorised field observations. Evidence and stop trigger
|
| R104A spelling variation holds an eligible grant application | An intake assistant treats a name or place variant as a mismatch and stops routing the application for review. | An eligible applicant could miss a grant deadline because the intake record was held. | Public administration and justice Jamaica Operational | Grant programme manager, with an education liaison | Check a closed sample of grant applications with spelling variations before introducing automated sorting. Evidence and stop trigger
Ministry of Labour and Social Security, PATH education grants |
| R105A catering buyer compares quantities that cannot be used alike | A school purchasing tool ranks a supplier using package size while ignoring usable quantity or a delivery cost. | A school could pay more per serving or choose a supplier on an incorrect comparison. | Tourism, retail and small businesses Martinique Operational | Participating school catering buyer | Reprice a school kitchen’s recurring basket from invoices and compare the assistant’s supplier ranking. Evidence and stop trigger
INSEE, Food prices in Martinique and metropolitan France, 2022 |
| R106A visitor assistant leaves out active small operators | The listing favours operators on one booking channel and suppresses verified businesses listed locally. | An active operator could lose visibility or bookings despite meeting the listing rules. | Tourism, retail and small businesses Mexico Operational | Participating municipal tourism office and operator panel | Audit which operators the visitor assistant leaves out. Evidence and stop trigger
|
| R107A passenger notice inherits the terms for cargo service | An AI summary mixes the operator, service type or update time of two access notices. | Passengers or freight users could follow the wrong timetable or service instructions. | Transport, logistics and disaster response Montserrat Operational | Access information editor | Check a sample week of passenger and freight notices against their originating operators. Evidence and stop trigger
|
| R108A fisheries record discloses restricted locations through an export | A reconciliation export exposes the coordinates of trap sites when only landed weights need to be shared. | A supplier or reader could learn restricted fishing coordinates. | Agriculture and fisheries Nicaragua Operational | Participating fisheries cooperative treasurer | Reconcile a landing without collecting location histories. Evidence and stop trigger
FAO, sustainable lobster fisheries on Nicaragua’s Caribbean coast |
| R109A provisional booking becomes a confirmed sailing notice | A forecast treats a slot as secured and the dispatcher’s notice goes to a customer before confirmation. | A customer could act on a booking that the dispatcher cannot honour. | Transport, logistics and disaster response Panama Operational | Participating freight dispatcher | Compare forecasts with actual bookings before sending a sailing notice. Evidence and stop trigger
|
| R110Two language versions ask for different documents | A municipal assistant gives different requirements or deadlines to Spanish-first and English readers. | A resident could bring the wrong documents or miss a deadline because of the language version used. | Public administration and justice Puerto Rico Operational | Participating municipal service manager and bilingual reviewers | Audit whether a municipal assistant gives the same appointment requirements in both languages. Evidence and stop trigger
US Census Bureau, 2020 Census Language Program Operational Assessment |
| R111A Fort Bay cargo instruction survives a correction in an old thread | A revised harbour notice goes live while an earlier instruction remains the answer in another channel. | A cargo team could follow a superseded instruction and miss a handoff. | Transport, logistics and disaster response Saba Operational | Harbour communications officer | Stage a Fort Bay cargo status change while an earlier copy remains in a message thread. Evidence and stop trigger
|
| R112A water estimate assumes production during planned maintenance | A forecast for a busy week fails to adjust supply when the operator expects a maintenance outage. | Households could rely on a supply notice that omits planned downtime. | Energy, water and data centres Saint-Barthélemy Operational | Participating water operations supervisor | Compare the water planner’s estimate during a busy week with a second run that includes planned maintenance. Evidence and stop trigger
IEDOM, Saint-Barthélemy economic report 2022, water and sanitation |
| R113A shared allocation model merges two islands’ water records | A model uses one island’s demand or asset readings to recommend an allocation on the other. | An operator could allocate water using figures for the other island. | Energy, water and data centres Saint Kitts and Nevis Operational | Participating water operations leads on each island | Run the same water-allocation exercise using two separately approved sets of local records. Evidence and stop trigger
Ministry of Public Infrastructure, Why Desalination Matters for St. Kitts and Nevis |
| R114A radio notice changes the action although the place name is right | A practice notice directs a community to do something different from the authorised alert. | Listeners could act at the correct place and still take the wrong safety action. | Transport, logistics and disaster response Saint Lucia Operational | Community broadcaster and sponsoring service editor | Run a radio rehearsal on a dated practice notice with listeners from the named area. Evidence and stop trigger
|
| R115A school notice gives families different collection entrances | A changed collection time or gate appears in one language version and the old instruction remains in the other. | Families could arrive at a different gate or time from the one the school can staff. | Education and research Saint-Martin (French part) Operational | Participating headteacher and bilingual reviewer | Test one school collection notice in French and English with a change of entrance and time. Evidence and stop trigger
|
| R116An inter-island appointment requires an impossible journey | A booking assistant assigns a slot without checking the boat or road connections a patient needs. | A patient could lose their slot after the system offered no feasible journey. | Health and clinical care Saint Vincent and the Grenadines Operational | Participating clinic scheduling supervisor | Test a booking that looks possible on the screen but requires an inter-island journey. Evidence and stop trigger
|
| R117A release summary matches the wrong consignee | An AI cargo record chooses a similar name and changes who can receive a shipment. | Cargo could be released to the wrong party before the manifest is checked. | Transport, logistics and disaster response Sint Eustatius Operational | Harbour supervisor and manifest clerk | Review a sample of cargo releases using both the harbour record and the original manifest. Evidence and stop trigger
|
| R118An earlier housing assessment hides a resident’s new evidence | An AI summary preserves the earlier decision even after residents submit a credible correction. | A resident could receive an adverse repair decision while their correction is still unreviewed. | Public administration and justice Sint Maarten Operational | Participating housing recovery review lead | Compare repair assessments before and after residents add evidence. Evidence and stop trigger
Sint Maarten National Recovery Program Bureau, Home Repair Program |
| R119An assessment marks a correct local-language explanation wrong | A marking aid confuses the language of a learner’s answer with their grasp of the concept. | A pupil could lose credit for a correct explanation in a local language. | Education and research Suriname Operational | Participating teacher and paid local language reviewer | Compare classroom feedback on the same science concept in Dutch and in a language selected by participating speakers. Evidence and stop trigger
UNICEF Suriname, From Classroom to Differentiated Education programme evaluation, 2023 |
| R120An archive permission for a recording reaches the wrong use | A catalogue tool treats agreed preservation or listening as permission for a public excerpt or new reuse. | A recording could be released or reused without the permission agreed with performers or custodians. | Culture and creative rights Trinidad and Tobago Operational | Participating panyard representatives and archive curator | Run an archive permission test on a catalogue entry, a public excerpt and a request to reuse the recording. Evidence and stop trigger
|
| R121An island staffing forecast pools unlike shifts | A tool recommends shift levels for an island using demand records from a different island or period. | Operators could schedule too few workers for a busy island shift or incur avoidable call-in costs. | Industry and workforce Turks and Caicos Islands Operational | Participating operators and staff representatives | Compare an island-level staffing forecast with completed shifts. Evidence and stop trigger
Turks and Caicos Islands Statistics Authority, visitor arrival series |
| R122A ferry change reaches the web but misses the terminal | Travel instructions disagree between the terminal and web channels after a departure changes. | Passengers could follow an expired departure and miss transport. | Transport, logistics and disaster response US Virgin Islands Operational | Participating operator and passenger information desk | Rehearse one changed ferry departure across the web and terminal channels. Evidence and stop trigger
|
| R123A landing summary applies the wrong unit before a payment | A summary of sardine landings mixes units or duplicates a buyer’s weigh-in. | Fishers or buyers could be paid the wrong amount before the landing records are reconciled. | Agriculture and fisheries Venezuela Operational | Participating landing association and buyer representative | Reconcile a sample day of sardine landings before any payment changes. Evidence and stop trigger
|
No risks match these filters. Clear a filter or try another term.