Barbados AI framework
Independent CAIA consultation proposal • 27 November 2026 · Revision 2
An AI investment in Barbados should answer questions that residents can check. Who received the water saved by finding a leak? Which fish vendor had to correct a price? Could a small supplier still bid? The tests proposed here put those questions into procurement and public reporting.
Read the research Download the editable edition (Word)
Four decisions for Barbados
| Local priority | Decision the framework proposes |
|---|---|
| Economic | Compare the tool’s prices with sales of the same fish in the same form and unit. FAO, fisheries and aquaculture circular, Barbados fisheries asset and value-chain analysis |
| Social | Test one complete enquiry with a screen reader, a telephone and an in-person alternative. Parliament of Barbados, revised draft Estimates 2026–27, National Disability Unit, PDF p. 369 |
| Political and institutional | Record the tender version and publish substantive corrections to all potential bidders. Government of Barbados, Public Procurement (Amendment) Act 2023–11, replacement section 85, PDF p. 27 |
| Environmental | Compare forecast volume with metered flow and document the operator’s decision when they diverge. Barbados Water Authority, Climate Resilient South Coast Water Reclamation Project |
Who acts first
Run a shadow forecast on a metered water route without changing allocations.
Proposed lead. Participating water operations manager
What to measure. Report forecast error in volume and hours staff spent resolving discrepancies.
Test a tender enquiry with first-time and returning suppliers.
Proposed lead. Participating procurement officer
What to measure. Count incorrect registration answers and time to notify bidders of each correction.
How the five regional checks apply
- Infrastructure
- Test voice reports in Bajan and in standard English. Invite people who cannot use a smartphone to phone in a report. Ask them to repeat the location the tool recorded.
- Data and permissions
- Compare leak alerts with the faults crews confirm. Count trips that found no leak and leaks that triggered no alert. Test neighbourhoods with water pressure problems even if they submit few reports.
- Talent and local review
- Invite the utility dispatch supervisor to compare the output with local observations.
- Governance and suspension
- Name a person with authority to suspend the trial. Pause and review affected work if a verified leak reported by telephone disappears from the repair queue.
- Adoption and public reporting
- Use the same case set and service channels for the current process and the trial. Publish completion, correction time and the decision to stop, revise or expand. The utility should name the person who may issue or change a water service notice. Do not let the model change an individual supply or bill. Explain how to challenge a wrong reading.
Local approval and regional cooperation
Offer Caribbean utilities a shared set of leak tests and repair-time measures. Keep customer addresses and decisions over water allocation with the Barbadian service owner.
Record the local approval, correction route and stop authority before exchanging results. Other jurisdictions can reuse the method and run their own tests. Regional recommendation 5.
Regional policy · Barbados legal and safety guidance · Regional risk register
Related sector guides: Energy, water and data centres · Industry and workforce.
A 90-day plan for the first service
Run a shadow forecast on a metered water route without changing allocations.
Proposed pilot lead. Participating water operations manager
A water forecast overlooks a leak reported by phone
Failure to test. A metered route appears stable because a call-centre report has not entered the forecast data.
Evidence to retain. Keep source times for the calls and meters, observed use, forecast errors and the dispatch supervisor’s decision.
Pause condition. A known leak or unresolved reading could change a proposed allocation.
| When | Proposed action and evidence |
|---|---|
| Days 1–30 | Participating water operations manager agrees the eligible cases, existing service measures, staffed alternative and authorised decision owner. Record reviewers and a cost estimate in local currency for staff time, testing, access and recovery. Identify the funding source and who would approve it. |
| Days 31–60 | Run the original and proposed routes on the same sample. Report forecast error in volume and hours staff spent resolving discrepancies. Report counted errors and eligible cases by channel and language where lawful, plus the time from error report to correction. |
| Days 61–90 | Witness the fallback, correction and restart before asking the accountable officer for a decision. Pause on the condition above. Record affected cases, unresolved issues, costs and the date for the next check. |
| Six months after live launch | Publish a lawful comparison with the baseline, including corrections, open complaints and the decision to continue, change or end the use. |
Sponsorship, funding and the proposed lead’s acceptance require a recorded local decision. Share test methods with Caribbean partners using the local data permissions.
Sector guide · Barbados Water Authority, Climate Resilient South Coast Water Reclamation Project · Local evidence and sources · Regional high-impact use rules · Local risk scenario