Energy, water and data centres sector guide

Independent CAIA consultation guidance. This material does not change the law. Confirm the duties and authorities that apply to the particular use.
What evidence is available?
This guide proposes a test. No measured result from this CAIA pilot is documented. The trial lead should report the baseline, number of cases, errors, and corrections before recommending wider use.
Plan computing capacity against a defined workload and the environmental limits of the site and community.
A pilot for this sector
Test how a utility prioritises leak reports
Compare the existing dispatch queue with technicians’ findings. Record delays for telephone and online reports separately.
How the sector uses the regional pillars
- Infrastructure
- Test dispatch with the tool offline; crews must still receive work orders by radio or phone.
- Data
- Use closed work orders, including repeat calls, low-pressure areas and faults reported during communications outages. Mask customer identifiers.
- Talent
- Name a network operations manager to organise the review. Give frontline staff time to check and correct trial outputs.
- Governance
- Pause on this condition: A confirmed urgent fault drops out of view or staff cannot recover the original queue during an outage.
- Adoption
- Count confirmed urgent leaks sent down the queue out of all confirmed urgent leaks. Compare waiting times by reporting channel.
- Stop and restore
- Dispatch from the original log and reconcile open work orders with crews.
Where AI could help
- Compare modest rented capacity, a phased build and a locally hosted service delivering the same workload. Use forecasts to help staff plan maintenance or monitor grid demand.
- An independent utility review can establish which loads can run during a supply constraint.
What could go wrong
- Annual power averages can hide local peaks. Cooling may compete for scarce dry-season water. Backup generators can add air pollution and noise, while poorly sited equipment may fail during floods.
Controls and safeguards
- Check peak power and annual use separately, name the water source and compare withdrawals with dry-period supply. Ask the competent authority which air, noise and drainage limits apply.
- Use the infrastructure annex to identify drills, data export and disposal evidence.
Who should act and what to do next
- The operator, utility and competent local authorities approve their parts under applicable rules. Train local staff to monitor limits, explain the numbers and run a fallback. Give neighbours an accessible complaint channel and a contact during outages.
What to measure
- Track peak MW, annual MWh, dry-period intake, measured limits and the time to restore service. Identify estimates until measurement is possible.
Sources
- IEA Energy and AI
- IFC Environmental, Health and Safety Guidelines
- ITU-T L.1300, Best practices for green data centres
Apply this guidance locally
These country notes offer related local tests.
- Barbados · South-coast leak reporting
- Panama · A dry-season water allocation exercise
- Puerto Rico · A power restoration report
- Saint Kitts and Nevis · An island-by-island water forecast
Regional framework · All country pilot notes · Risk entries R09, R11