Grenada AI framework
Independent CAIA consultation proposal • 27 November 2026 · Revision 2
A national dashboard can hide the differences between a damaged nutmeg tree, a pupil who has changed schools and a repair crew waiting on Carriacou. This paper proposes separate checks on Grenada, Carriacou and Petite Martinique before a common record is used to direct assistance.
Read the research Download the editable edition (Word)
Four decisions for Grenada
| Local priority | Decision the framework proposes |
|---|---|
| Economic | Compare remote estimates with dated crop inspections and preserve the grower’s correction. Government of Grenada and partners, Hurricane Beryl Post-Disaster Needs Assessment |
| Social | Keep both source entries visible to the transfer officer until the school confirms the move. Government of Grenada and partners, Beryl needs assessment, education recovery |
| Political and institutional | Test questions about recent registrations and require the official verification route in every uncertain answer. Organization of American States, final report of the 2022 electoral observation mission in Grenada, section on electoral registries |
| Environmental | Show the date and source of the last check for each recommended stopping point. Government of Grenada, Second National Communication, Carriacou marine protected area |
Who acts first
Compare a sample of storm-damage estimates with inspections of bearing nutmeg and cocoa trees.
Proposed lead. Participating extension officer and growers
What to measure. Report false low-damage assessments and corrected estimates by crop.
Test a transfer record for a learner moving between islands.
Proposed lead. Participating receiving-school registrar
What to measure. Measure time to confirm placement and count mistaken duplicate removals.
How the five regional checks apply
- Infrastructure
- Pay boatbuilders to review photographs, terms and damage categories. A boatbuilder who withholds a drawing or technique should remain eligible for a workshop inspection.
- Data and permissions
- Make paper and phone reporting available to outlying communities. Compare missed workshops and time to inspection on each island. Remove identifying details from small public totals when a single business could be recognised.
- Talent and local review
- Invite the recovery inventory lead and participating boatbuilders to compare the output with local observations.
- Governance and suspension
- Name a person with authority to suspend the trial. Pause and review affected work if a workshop design is distributed beyond the builder’s permission.
- Adoption and public reporting
- Use the same case set and service channels for the current process and the trial. Publish completion, correction time and the decision to stop, revise or expand. Have an authorised officer sign any funding decision. Give the applicant a short reason, a named reviewer and a deadline for correcting a mistaken damage grade.
Local approval and regional cooperation
Neighbouring islands can reuse a boatyard damage checklist. Share inspection lessons, not designs. Grenadian officers would retain control over aid decisions and builders over any agreed use of their work.
Record the local approval, correction route and stop authority before exchanging results. Other jurisdictions can reuse the method and run their own tests. Regional recommendation 5.
Regional policy · Grenada legal and safety guidance · Regional risk register
Related sector guides: Industry and workforce · Finance and insurance · Transport, logistics and disaster response.
A 90-day plan for the first service
Compare a sample of storm-damage estimates with inspections of bearing nutmeg and cocoa trees.
Proposed pilot lead. Participating extension officer and growers
A storm assessment undercounts bearing trees
Failure to test. A photograph-based estimate overlooks damage to bearing nutmeg or cocoa trees seen on inspection.
Evidence to retain. Keep paired field and image observations, including observed crop and corrected loss category.
Pause condition. A verified loss could remain excluded from a recovery review.
| When | Proposed action and evidence |
|---|---|
| Days 1–30 | Participating extension officer and growers agrees the eligible cases, existing service measures, staffed alternative and authorised decision owner. Record reviewers and a cost estimate in local currency for staff time, testing, access and recovery. Identify the funding source and who would approve it. |
| Days 31–60 | Run the original and proposed routes on the same sample. Report false low-damage assessments and corrected estimates by crop. Report counted errors and eligible cases by channel and language where lawful, plus the time from error report to correction. |
| Days 61–90 | Witness the fallback, correction and restart before asking the accountable officer for a decision. Pause on the condition above. Record affected cases, unresolved issues, costs and the date for the next check. |
| Six months after live launch | Publish a lawful comparison with the baseline, including corrections, open complaints and the decision to continue, change or end the use. |
Sponsorship, funding and the proposed lead’s acceptance require a recorded local decision. Share test methods with Caribbean partners using the local data permissions.
Sector guide · Government of Grenada, Second National Communication, Carriacou marine protected area · Local evidence and sources · Regional high-impact use rules · Local risk scenario