Caribbean AI Association

Grenada AI policy proposal

Proposed CAIA policy for organisations adopting AI in Grenada. Each participating organisation would approve its own uses and remain responsible for decisions affecting residents.

Independent consultation text from the Caribbean AI Association. Adoption by a government or regulator has not been established.

Policy commitments for Grenada

A national dashboard can hide the differences between a damaged nutmeg tree, a pupil who has changed schools and a repair crew waiting on Carriacou. This paper proposes separate checks on Grenada, Carriacou and Petite Martinique before a common record is used to direct assistance.

When a damaged tree still looks green

Compare remote estimates with dated crop inspections and preserve the grower’s correction.

Government of Grenada and partners, Hurricane Beryl Post-Disaster Needs Assessment

A child who changes island must stay on the school roll

Keep both source entries visible to the transfer officer until the school confirms the move.

Government of Grenada and partners, Beryl needs assessment, education recovery

A search result cannot settle voter registration

Test questions about recent registrations and require the official verification route in every uncertain answer.

Organization of American States, final report of the 2022 electoral observation mission in Grenada, section on electoral registries

Read a mooring map alongside the reef

Show the date and source of the last check for each recommended stopping point.

Government of Grenada, Second National Communication, Carriacou marine protected area

Evidence and implementation timetable

Safeguards before a service goes live

Apply these proposed safeguards to the service below. The responsible authority should check the legal basis, who can approve the use, what law is in force and any applicable reporting deadline. Record the exact provision and date checked in the decision record. Local authority and legal sources

A storm assessment undercounts bearing trees

Proposed pilot lead. Participating extension officer and growers

Failure to test. A photograph-based estimate overlooks damage to bearing nutmeg or cocoa trees seen on inspection.

Evidence to retain. Keep paired field and image observations, including observed crop and corrected loss category.

Pause condition. A verified loss could remain excluded from a recovery review.

DecisionRecord before going live
Classify the useDocument the decision affected, the service population, known exclusions, lawful data access and the applicable authority. A material effect on rights, safety or access puts the service in the high-impact review route.
Give people a way to challengeUse the staffed contact of the sponsoring service. Give people the case reference, a reason, a correction route they can access and any lawful appeal deadline. Preserve the original receipt and tell the person when an authorised officer changes the result.
Test the safeguardUse matched cases in shadow mode, including channel or language failures that matter here. Retain evidence for users who need accessibility assistance. Ask an independent checker to sign the test and the limits of its evidence.
Act on a failureThe duty lead pauses the affected action and switches to the staffed route. Record affected cases and which authority received a notice on the applicable schedule. A different authorised officer reviews the correction and failed test before restart.
Record the final decisionPublish a lawful summary of who decided, what was tested, the review date and how to complain. List any omitted data and its reason. Confirm country and cross-border duties with counsel before deployment.

Incident response and reporting · Delivery and consultation records · Government of Grenada, Second National Communication, Carriacou marine protected area · Local evidence and sources · Regional high-impact use rules · Local risk scenario

Which decisions require approval?

A service owner should authorise each use that can change access, payment, eligibility, a warning or a public record. The signed approval should specify the task, the people affected and the decisions reserved for a person. A new supplier, purpose or category of personal information reopens the approval.

How the rule would work in Grenada

Worked example. In a trial file, an applicant provides an unfamiliar form of address evidence. Compare the model’s recommendation with the assessment a trained officer makes against the bank’s written criteria. Have the officer document the reason for selecting the ordinary or simplified process.

Who decides and what to keep. The bank’s compliance lead should keep the decision criteria, independent file reviews and reasons for any disagreement. Hold automated routing if the team cannot explain a risk category assigned to an applicant with missing information.

Read the full Grenada jurisdiction guide for the law, its scope and the issuing authorities. The example and implementation guidance above come from that guide.

Five checks before a service goes live

Apply the regional framework to one local decision first. The proposed field test here is a boatyard recovery inventory.

Infrastructure
Pay boatbuilders to review photographs, terms and damage categories. A boatbuilder who withholds a drawing or technique should remain eligible for a workshop inspection.
Data and permissions
Make paper and phone reporting available to outlying communities. Compare missed workshops and time to inspection on each island. Remove identifying details from small public totals when a single business could be recognised.
Talent and local review
Invite the recovery inventory lead and participating boatbuilders to compare the output with local observations.
Governance and suspension
Name a person with authority to suspend the trial. Pause and review affected work if a workshop design is distributed beyond the builder’s permission.
Adoption and public reporting
Use the same case set and service channels for the current process and the trial. Publish completion, correction time and the decision to stop, revise or expand. Have an authorised officer sign any funding decision. Give the applicant a short reason, a named reviewer and a deadline for correcting a mistaken damage grade.

How a resident can challenge a decision

At the point of service, explain where AI contributed and how to ask for a person to review the result. Accept a challenge through a channel the resident can use. The reviewer should check the underlying record, give reasons, correct any downstream notice and log the date the person received the answer.

Before restarting a suspended use, the service owner should check affected cases, repeat the failed test and record the reason for restarting. Open the local pilot and its test conditions.

What can be shared with neighbours?

Neighbouring islands can reuse a boatyard damage checklist. Share inspection lessons, not designs. Grenadian officers would retain control over aid decisions and builders over any agreed use of their work.

At a glance

One of the 15 CARICOM members in the main directory.

Internet use: 70.2% of the population (2024). ITU via World Bank, dated observation. National coverage can differ from conditions at the proposed test site.

Policy snapshot: The CTU table records no national AI strategy or UNESCO readiness assessment for this member. The snapshot describes early 2026. Government AI readiness rank: 174 in the 2025 edition. CTU report, Tables 2.2 and 3.3.

Legal source: Data Protection Act 2023, No. 1. Check commencement and the relevant provisions for the proposed use.

Sources and earlier guidance

Glossary term

Full glossary