Review and stop procedure for energy, water and data centres
The network operations manager should agree the following stop condition with the service owner before the trial starts.
- DetectLog the source and time.
- PauseSwitch to the agreed fallback.
- VerifyHave the reviewer sign off.
Pause the trial
A confirmed urgent fault drops out of view or staff cannot recover the original queue during an outage.
Restore the service
Dispatch from the original log and reconcile open work orders with crews.
Check before restarting
The control room repeats the outage drill and accounts for every open urgent report.
What to put in the decision record
Record the affected cases, who restored the service, which people need a correction and how to reach them. The reviewer should sign and date the repeat test before the service owner decides whether to resume.