Check if the grid can supply a data centre

Review peak site power, annual electricity use and the plans for outages before approving new computing capacity.

On this page

Compare demand with real grid conditions

Scenario: a developer seeks a connection for new AI hosting. The electricity utility and energy authority should ask for expected peak site demand, annual electricity use and how demand changes hour by hour. Include cooling and backup equipment. Identify when the facility expects to draw electricity, utility upgrades it may need and who pays for them. An annual total alone does not show how a busy hour affects the local grid.

Test lower-cost options first

The IEA finds that data-centre demand can be concentrated locally. Compare a staged local build, rented capacity and a smaller AI system on the same workload and service target. Dunkley and Dunkley’s Portmore analysis illustrates how comparing alternatives can expose trade-offs. It is a project model, not approval or proof of demand. Ask for written evidence of customers and costs before committing public funds.

Agree what happens in a shortage

The operator should run a test to show how it will reduce load or transfer work during a shortage. Publish who can request that response and what power sources it can use. If the utility cannot confirm capacity or the project cannot show workable backup, defer expansion and keep the staged or rented option under review.

Put it into practice

  1. Ask the utility to sign a connection and shortage-response assessment.

What to measure

  • Record peak megawatts, annual megawatt-hours and how quickly the facility reduces demand in a drill.