Caribbean AI Association

Caribbean AI Framework / Local consultationCountry pilot notes

Map outline of Puerto Rico

Puerto Rico: A power restoration report

Puerto Rico AI policy proposal Jurisdiction guidance and sources

The US Department of Homeland Security’s Inspector General documented Puerto Rico’s power-grid reconstruction after Hurricanes Irma and Maria. Before relying on an AI outage map, test whether someone can correct a restoration estimate while their power and internet are down.

CAIA proposes this pilot for local discussion. Participation, approval and trial results have not been documented for this note.

At a glance

This wider regional comparison follows one proposed test: a power restoration report. Its relevance is the service decision described below. Local participation and approval remain unverified.

Internet use: 87.3% of the population (2022). ITU via World Bank, dated observation. National coverage can differ from conditions at the proposed test site.

Local source to check: Ley 111 de 2005, notice to citizens concerning the security of information databases. Confirm the territorial scope, covered records and responsible office before using identifiable information in this pilot.

A power restoration report

Proposed review lead · Utility incident lead.

  1. Agree the useChoose the decision the trial may support.
  2. Check it locallyTry a report without mobile data.
  3. Decide whether to expandRecord the evidence, unresolved objections and decision owner.

How the five regional pillars apply here

Infrastructure
Repeat the local field test on the device or paper route people use when the usual connection fails. Record which steps still require staff.
Data
Before retaining or sharing a record, use the evidence check below.
Talent
Invite the utility incident lead to compare the output with local observations.
Governance
Name a person with authority to suspend the trial. Pause and review affected work if an unverified restoration estimate prevents a resident from reporting an ongoing outage.
Adoption
Compare the pilot and the current service on the same cases. Count errors, time spent on corrections and extra work passed to users. Record the local decision before sharing the test method.

Try a report without mobile data

Test Spanish-first voice and radio reporting with community workers as well as utilities. Include a resident without mobile data and a facility whose generator is failing. Do not publish a list of homes containing vulnerable people.

Compare restoration estimates with repair times

Compare restoration estimates with actual repair times by service area. Have the utility or emergency office confirm the public notice. Before buying a tool, check territorial approval and the conditions of any federal funding.

What to share with neighbours

Other island utilities could learn from Puerto Rico’s outage-reporting tests. Share error measures and repair categories. Keep critical network layouts and household medical information private.

Local sources

Use the sources below to check permissions for this particular test.

Use the regional and sector guides

Risk entries to review for the lead sector: R09, R11.

Glossary term

Full glossary