Caribbean AI Association

Set water and coastal limits before building

Ask where the water comes from

Exhibit 4.1 · Evidence for this test

In its 2025 base case the IEA projected 945 TWh of global data-centre electricity use in 2030. For a site decision, measure coincident peak load and dry-season water demand locally. International Energy Agency (2025). Energy and AI. Executive summary, 2024 estimate and 2030 base case.

Local indicator. Record completion, corrections and the outcome of the proposed test.

Ask the proposer to state the source, withdrawal and consumption separately for a typical month and for a hot, dry period. State where the accounting starts and ends, over what period, and when and where water returns. Check who else uses the source, how much usable storage exists and what happens during restrictions. Dry and evaporative cooling can trade electricity use for water use. Portmore research by Adrian and Nicholas Dunkley compares these options under assumptions. Use it to design questions for a bidder, not as a substitute for measurements at the proposed site. Use the same workload, weather and accounting period for every design in the comparison.

Sources

Glossary term

Full glossary