Set water and coastal limits before building

Follow the route from site to sea

Exhibit 4.3 · Evidence for this test

In its 2025 base case the IEA projected 945 TWh of global data-centre electricity use in 2030. For a site decision, measure coincident peak load and dry-season water demand locally. International Energy Agency (2025). Energy and AI. Executive summary, 2024 estimate and 2030 base case.

Local indicator. Record completion, corrections and the outcome of the proposed test.

Map stormwater, cooling discharge and fuel storage against waterways, settlements and sensitive coastal areas. The Cartagena Convention and its land-based pollution protocol offer wider-Caribbean context; check which instruments and local permit conditions apply to the site. Ask the responsible authorities to check sensitive habitats, flood risks and the discharge path before approval. Set monitoring points upstream and downstream where practicable. Publish the permitted limits and who will investigate an exceedance.

Sources

Glossary term

Full glossary