Chapter 4 of 11
Set water and coastal limits before building
A power-saving design can still use more water. Set limits by site and season, then measure impacts on the communities and coast near the project.
Exhibit 4.0 · Evidence for this test
In its 2025 base case the IEA projected 945 TWh of global data-centre electricity use in 2030. For a site decision, measure coincident peak load and dry-season water demand locally. International Energy Agency (2025). Energy and AI. Executive summary, 2024 estimate and 2030 base case.
Local indicator. Record completion, corrections and the outcome of the proposed test.
Chapter topics
Ask where the water comes from
Ask the proposer to state the source, withdrawal and consumption separately for a typical month and for a hot, dry period.
Follow the route from site to sea
Map stormwater, cooling discharge and fuel storage against waterways, settlements and sensitive coastal areas.
Count what the project adds beyond its fence
UNESCO’s AI ethics recommendation covers environmental well-being.
Explore related topics
Protect local water supplies before expanding
Compare water withdrawals and consumption in hot, dry conditions. Make the source and shortage priorities explicit.
Check what reaches the coast
Review stormwater, discharge and fuel paths before opening facilities near coastal communities or habitats.
Keep essential services working through a storm
Prepare local validation and a manual procedure for hurricane alerts and other essential services.
Check AI advice against conditions on the farm
A cooperative can use AI to organise observations and make a briefing easier to read. Conditions on farms and islands differ, so a local check should come before an advisory goes out.
Put it into practice
- Ask for a dry-season water budget and an independently checked drainage map before approval.
- Publish who can pause the project when a permit limit is exceeded.
What to measure
- Track daily withdrawal, consumption and discharge using separately named units and sources.
- Compare outage or storm drill results with written service recovery targets.