Set water and coastal limits before building
Count what the project adds beyond its fence
Exhibit 4.2 · Evidence for this test
In its 2025 base case the IEA projected 945 TWh of global data-centre electricity use in 2030. For a site decision, measure coincident peak load and dry-season water demand locally. International Energy Agency (2025). Energy and AI. Executive summary, 2024 estimate and 2030 base case.
Local indicator. Record completion, corrections and the outcome of the proposed test.
UNESCO’s AI ethics recommendation covers environmental well-being. Apply it by separating the facility’s own electricity, water and emissions from those linked to power generation and equipment. State the boundary before comparing options; shifting consumption elsewhere does not make it disappear. Where AI is proposed for hurricane alerts or marine monitoring, check it against observations from the area and have staff rehearse how to respond when the model or sensor fails.