Caribbean AI Association

Risk register

Framework home · Policy document

Each row describes an event that could affect a service and the harm it could cause. Tiers group events by the potential spread of harm and the uncertainty involved. The entries await assessment by the responsible service.

Independent CAIA consultation guidance. It does not establish legal duties, issue approvals or replace applicable law and permit conditions.

How to use the register

  1. Identify the service, people affected, conditions that could cause the event and the existing controls.
  2. Assess likelihood and impact before and after treatment using local evidence. Set an assessment period and record any uncertainty.
  3. Assign a risk owner and treatment owner. Record the decision, due date, status and next review. Reassess after a material change or incident.

Assess a local risk

Download the editable risk register (XLSX) · Download the scenario list (CSV) · Incident reporting and handoff

The workbook includes fields for current controls, inherent and residual assessments, treatment, ownership, status and review. Leave unknown values blank until there is evidence to assess them.

NIST enterprise risk register example · NIST guidance on identifying and estimating risk · NIST guidance on risk response · HM Treasury Orange Book, Annex 2 · NIST AI Risk Management Framework

Scenario research MIT AI Risk Repository · OECD incident monitor

Jump to a risk
  1. R01 Identity errors and impersonation
  2. R02 Sensitive data leaves its approved route
  3. R03 People accept a wrong AI answer
  4. R04 Fraud or unauthorised system changes
  5. R05 Service excludes people
  6. R06 Poor training creates hidden work
  7. R07 Cultural material is used without authority
  8. R08 Power demand strains the local grid
  9. R09 Cooling competes for water in dry periods
  10. R10 Local air, noise, heat or runoff affects neighbours
  11. R11 Flood or storm interrupts multiple services
  12. R12 Batteries and electronics lack a safe end route
  13. R13 Automation pressures pay and entry-level work
  14. R14 Skills leave faster than local roles grow
  15. R15 Foreign provider dependency defeats an exit
  16. R16 Political or supplier pressure distorts public decisions
  17. R17 Concentration weakens local economic and policy choices
  18. R18 Severe failure spreads across essential services
  19. R19 Advanced systems could escape effective oversight
  20. R20 Negation lost in a referral draft
  21. R21 Result units change during transfer
  22. R22 A delayed correction fails to reach the next team
  23. R23 A translated instruction changes the type of appointment
  24. R24 A documentation trial consumes urgent review time
  25. R25 Late data make a parish appear quiet
  26. R26 A chart carries instructions that a screen reader skips
  27. R27 Small-area numbers identify a patient
  28. R28 A help channel mistakes an accessibility request for refusal
  29. R29 A resource summary uses an expired clinic capacity report
  30. R30 A marking aid mistakes a dialect for a wrong answer
  31. R31 A research summary cites an article that cannot be located
  32. R32 A recorded learning need moves outside the authorised school team
  33. R33 An online-only task excludes learners with intermittent access
  34. R34 A model comparison reuses its test examples for tuning
  35. R35 A postcode substitutes for income evidence
  36. R36 A claim is assessed under the wrong contract edition
  37. R37 A similar name freezes the wrong account
  38. R38 A quote uses a rate from the wrong market or currency
  39. R39 Shared vendor failure blocks several claims channels
  40. R40 An unofficial election notice changes a polling instruction
  41. R41 A model treats missing records as grounds for refusing a benefit
  42. R42 A court date changes without passing through the official register
  43. R43 A biometric match is treated as identity evidence by itself
  44. R44 A translation shortens the stated appeal period
  45. R45 A public excerpt uses a voice beyond the agreed purpose
  46. R46 An archive tool reveals a restricted ceremony
  47. R47 An export loses attribution metadata
  48. R48 A classifier suppresses a local expression as abuse
  49. R49 Generated visuals carry rights the buyer cannot transfer
  50. R50 A cool-month model understates dry-season demand
  51. R51 A restart load falls outside the connection study
  52. R52 A facility’s emissions ledger omits backup generation
  53. R53 A replacement plan assumes disposal options that are unavailable
  54. R54 An optimisation draft ignores a sensor outage
  55. R55 An AI crop advisory uses the wrong planting zone
  56. R56 A message repeats an expired fishing boundary
  57. R57 A landing model compares incomparable catch weights
  58. R58 A precision irrigation suggestion omits salinity
  59. R59 A photograph alone sends a disease alert to growers
  60. R60 An automated refund answer ignores a storm closure
  61. R61 A price recommendation moves the decimal or currency
  62. R62 A directory advertises an entrance a disabled guest cannot use
  63. R63 A ranking buries locally verified retailers
  64. R64 A store treats customer contact as consent for a campaign
  65. R65 A support summary treats a disputed identity step as complete
  66. R66 An outage dashboard shows silence as restoration
  67. R67 A corrected alert fails to reach a carrier channel
  68. R68 A support classifier closes an accessibility grievance
  69. R69 A network expansion plan treats call volume as population need
  70. R70 A routing suggestion sends a vehicle towards a flooded crossing
  71. R71 A cargo summary assigns the wrong inspection status
  72. R72 An aid directory routes residents to an unusable shelter
  73. R73 A transshipment estimate hides a missed handoff
  74. R74 A shared transport feed interrupts several warning routes
  75. R75 A shift note marks an unresolved hazard as cleared
  76. R76 A rota optimisation leaves the only trained worker unavailable
  77. R77 A hiring tool filters applicants over a recorded accommodation
  78. R78 A score penalises work carried out away from the tracking tool
  79. R79 A system update removes the manual sign-off route
  80. R80 A ferry surge becomes a room forecast
  81. R81 A lagoon map removes a use that fishers rely on
  82. R82 A Papiamento notice sends someone to the wrong counter
  83. R83 A Family Island relief map shows a closed dock as open
  84. R84 A water forecast overlooks a leak reported by phone
  85. R85 A visitor assistant sends people to a reserve without permission
  86. R86 A summary changes the currency of a financial commitment
  87. R87 A handoff between counters resets a filing date
  88. R88 A clinic reminder requires travel to the wrong island
  89. R89 An assistance application restarts on another channel
  90. R90 A translated clinic reminder changes the appointment location
  91. R91 A forest alert draws an inspection away from verified change
  92. R92 Street images conceal housing damage on the inside
  93. R93 A Papiamentu service answer changes the action required
  94. R94 A remote damage assessment misses an affected farm asset
  95. R95 A tourism forecast applies national volume to local bookings
  96. R96 A reconstruction passes as a documented historical detail
  97. R97 A clinic books an interior appointment a patient cannot reach
  98. R98 A storm assessment undercounts bearing trees
  99. R99 A water notice gives the wrong service area
  100. R100 A lesson mistranslates a step pupils need to follow
  101. R101 A forest alert changes a village decision before field review
  102. R102 A Kreyòl warning loses its location during a power cut
  103. R103 A reserve change alert mixes observations from different dates
  104. R104 A spelling variation holds an eligible grant application
  105. R105 A catering buyer compares quantities that cannot be used alike
  106. R106 A visitor assistant leaves out active small operators
  107. R107 A passenger notice inherits the terms for cargo service
  108. R108 A fisheries record discloses restricted locations through an export
  109. R109 A provisional booking becomes a confirmed sailing notice
  110. R110 Two language versions ask for different documents
  111. R111 A Fort Bay cargo instruction survives a correction in an old thread
  112. R112 A water estimate assumes production during planned maintenance
  113. R113 A shared allocation model merges two islands’ water records
  114. R114 A radio notice changes the action although the place name is right
  115. R115 A school notice gives families different collection entrances
  116. R116 An inter-island appointment requires an impossible journey
  117. R117 A release summary matches the wrong consignee
  118. R118 An earlier housing assessment hides a resident’s new evidence
  119. R119 An assessment marks a correct local-language explanation wrong
  120. R120 An archive permission for a recording reaches the wrong use
  121. R121 An island staffing forecast pools unlike shifts
  122. R122 A ferry change reaches the web but misses the terminal
  123. R123 A landing summary applies the wrong unit before a payment

Find a risk

123 risks
Regional risk register
RiskRisk eventPotential consequenceSector and jurisdictionProposed ownerResponse and evidence
R01Identity errors and impersonationA service accepts an impersonator or matches a sensitive record to the wrong person.The wrong person could receive money, gain access or learn private information.Cross-sector
Regional example
Operational
Service manager

Confirm identity using the organisation’s existing process; give the person a correction route.

Evidence and stop trigger
Assessment basis
Use verified local incidents and test cases. Neither establishes a future rate.
Warning sign
A sensitive record was assigned to the wrong person or a contact changed outside the approved channel.
Consequence in context
High for payments or access
Evidence to retain
Retain the local observation, control test and responsible reviewer’s decision.
Stop or escalation trigger
Hold the affected decision or payment and refer it to the responsible officer.

CAIA Caribbean AI Safety and Alignment guidance

R02Sensitive data leaves its approved routeA prompt, file, log or export carries sensitive data outside its approved storage, use or recipients.Affected people could lose privacy or control of their records.Cross-sector
Regional example
Operational
Privacy officer

Map the data route; minimise information and verify permissions with the supplier.

Evidence and stop trigger
Assessment basis
Use access reviews and local incident logs. Unknown vendor access is an evidence gap.
Warning sign
An unapproved recipient, data destination or model-training use appears in the record.
Consequence in context
High; may be irreversible
Evidence to retain
Retain the local observation, control test and responsible reviewer’s decision.
Stop or escalation trigger
Suspend the affected transfer and use the applicable reporting process.

UNESCO Recommendation on the Ethics of AI

R03People accept a wrong AI answerA reviewer acts on an incorrect model answer without confirming it against the source.A false conclusion could change a decision and require correction.Cross-sector
Regional example
Operational
Quality lead

Give reviewers time, source access and authority to correct the outcome.

Evidence and stop trigger
Assessment basis
Blind comparisons and correction logs can show local errors. Unreviewed outputs cannot establish accuracy.
Warning sign
Reviewers accept a seeded error or cannot trace an answer to its approved source.
Consequence in context
High for consequential decisions
Evidence to retain
Retain the local observation, control test and responsible reviewer’s decision.
Stop or escalation trigger
Pause automatic use for that decision until the review is retested.

NIST AI Risk Management Framework 1.0

R04Fraud or unauthorised system changesAn agent or impersonator makes a consequential change without the required approval.Records, payments or system access could change before staff can intervene.Cross-sector
Regional example
Operational
Security lead

Keep approvals in the existing system; restrict permissions and rehearse incident response.

Evidence and stop trigger
Assessment basis
Track confirmed incidents, failed approval drills and access review findings. Unreported incidents are not counted.
Warning sign
A consequential action lacks recorded approval or a critical account retains unneeded permissions.
Consequence in context
High
Evidence to retain
Retain the local observation, control test and responsible reviewer’s decision.
Stop or escalation trigger
Revoke affected access, preserve evidence and route the case through the incident plan.

NIST Cybersecurity Framework 2.0

R05Service excludes peopleA person cannot finish a required task through the available language, device or accessible channel.The person could lose a service, benefit or opportunity to appeal.Cross-sector
Regional example
Operational
Service owner

Repair the failure and retain a staffed alternative.

Evidence and stop trigger
Assessment basis
Test locally by language, disability access and channel; note missing groups and sample sizes.
Warning sign
Someone cannot finish a required task with assistive technology or in a supported language.
Consequence in context
High for essential services
Evidence to retain
Retain the local observation, control test and responsible reviewer’s decision.
Stop or escalation trigger
Do not make the AI route mandatory while access is unresolved.

Dunkley, CAIA LAC Eval, test plan

R06Poor training creates hidden workStaff miss material errors after release because training tested attendance or recall in place of the actual task.Review queues and correction time could grow even if drafting becomes faster.Cross-sector
Regional example
Operational
Training lead

Provide paid task practice using approved records and feedback from a supervisor.

Evidence and stop trigger
Assessment basis
Compare corrections, supervision and work quality before and after the trial.
Warning sign
Staff pass a course but cannot spot material errors in a supervised exercise.
Consequence in context
Moderate to high
Evidence to retain
Retain the local observation, control test and responsible reviewer’s decision.
Stop or escalation trigger
Keep independent checks and delay wider use until staff can perform them.

CAIA Caribbean AI Safety and Alignment guidance

R07Cultural material is used without authorityA service reuses a voice, recording or culturally restricted item outside the permission granted.Creators or communities could lose control of the material and face wider reuse.Cross-sector
Regional example
Operational
Archive or rights lead

Consult the relevant rights holder or custodian, agree compensation where applicable and log permitted reuse.

Evidence and stop trigger
Assessment basis
Audit permissions and complaints. An empty complaints log does not verify consent.
Warning sign
A recording, likeness or restricted cultural item has no verified approved use.
Consequence in context
High where harm cannot be undone
Evidence to retain
Retain the local observation, control test and responsible reviewer’s decision.
Stop or escalation trigger
Remove the material from the service until authority is established; use the dispute process.

WIPO, Traditional Cultural Expressions

R08Power demand strains the local gridA facility draws more power at peak than the utility agreed or its backup can carry.The utility could face interruptions or unplanned capacity costs.Cross-sector
Regional example
Facility / community
Utility liaison

Compare scope, connection and staged options using the same workload.

Evidence and stop trigger
Assessment basis
Use utility studies, load readings and outage tests. Earlier demand projections are not readings.
Warning sign
Peak site demand exceeds the agreed capacity or backup cannot meet the written service requirement.
Consequence in context
High where essential demand competes
Evidence to retain
Retain the local observation, control test and responsible reviewer’s decision.
Stop or escalation trigger
Follow the agreed load-reduction procedure and pause expansion if capacity is unconfirmed.

International Energy Agency, Energy and AI

R09Cooling competes for water in dry periodsCooling demand draws beyond the permitted dry-period supply.Residents, farms or other users could have less water available.Cross-sector
Regional example
Facility / community
Facility water lead

Check alternate designs, named water sources, storage and shortage priority.

Evidence and stop trigger
Assessment basis
Compare dry-period supply evidence with metered withdrawals and consumption; identify forecasts.
Warning sign
Daily draw exceeds its agreed limit or the named source cannot supply users under restrictions.
Consequence in context
High where the source is scarce
Evidence to retain
Retain the local observation, control test and responsible reviewer’s decision.
Stop or escalation trigger
Reduce the affected operation as agreed and notify the relevant water authority where required.

Dunkley and Dunkley, Portmore data-centre assessment

R10Local air, noise, heat or runoff affects neighboursOperations send noise, heat, polluted air or runoff past the approved site boundary.Nearby communities or habitats could experience harm that requires a remedy.Cross-sector
Regional example
Facility / community
Environmental manager

Check generator use, cooling and drainage conditions. Publish the monitoring route.

Evidence and stop trigger
Assessment basis
Use seasonal baselines and operating measurements at relevant receptors; model estimates remain estimates.
Warning sign
A pollutant, discharge or noise reading exceeds an applicable limit, or complaints cluster at a sensitive site.
Consequence in context
High when exposure reaches people or sensitive areas
Evidence to retain
Retain the local observation, control test and responsible reviewer’s decision.
Stop or escalation trigger
Use the permit or response plan to halt the affected source and report where required.

IFC General Environmental, Health and Safety Guidelines

R11Flood or storm interrupts multiple servicesA storm disables the main and backup service through a shared feeder, fibre route or access road.People could lose communications or essential services during recovery.Cross-sector
Regional example
Facility / community
Continuity lead

Test fallback with affected agencies and retain independent access where feasible.

Evidence and stop trigger
Assessment basis
Compare hazard maps and site inspection with scenario drills; no drill predicts every storm.
Warning sign
A common feeder, fibre route or access road blocks both the main service and its backup.
Consequence in context
High
Evidence to retain
Retain the local observation, control test and responsible reviewer’s decision.
Stop or escalation trigger
Switch to the approved continuity process and delay restart until hazards are assessed.

CDEMA Regional Response Mechanism

R12Batteries and electronics lack a safe end routeRetired batteries or equipment accumulate or move outside the documented disposal route.Unsafe handling could expose workers, data or the environment.Cross-sector
Regional example
Facility / community
Facilities and waste lead

Separate waste streams through qualified operators and verify approvals, reuse or final disposal.

Evidence and stop trigger
Assessment basis
Track stock, incident records and transfer documentation by item category.
Warning sign
A damaged battery, retired drive or shipment has no documented handler or destination.
Consequence in context
High for fire, disposal or contaminated land
Evidence to retain
Retain the local observation, control test and responsible reviewer’s decision.
Stop or escalation trigger
Isolate affected equipment as the safety plan requires. Do not ship material without required approvals.

Basel Convention e-waste amendments

R13Automation pressures pay and entry-level workAn automation programme reduces entry-level work and shifts checking or overtime to staff.Workers could lose income, supported practice or a route into skilled roles.Cross-sector
Regional example
Regional / structural
Employer and worker representatives

Agree where time saved goes and protect paid pathways into more responsible roles.

Evidence and stop trigger
Assessment basis
Use worker feedback, pay and local staffing records. ILO task exposure is not a layoff forecast.
Warning sign
Overtime or verification rises while local entry roles and supervised practice decline.
Consequence in context
High for affected workers
Evidence to retain
Retain the local observation, control test and responsible reviewer’s decision.
Stop or escalation trigger
Suspend staffing changes attributed to the trial until quality and workload evidence is reviewed.

ILO, Generative AI and Jobs: Occupational Exposure

R14Skills leave faster than local roles growA service loses skilled workers before it can train or retain replacements.A team could become unable to operate, review or change its own system.Cross-sector
Regional example
Regional / structural
Workforce programme lead

Fund placements, mentoring and local handover. Track jobs that persist after the contract.

Evidence and stop trigger
Assessment basis
Track local placements and retention against agreed periods. A training count does not show migration.
Warning sign
Funded trainees cannot move into paid roles that use the skills, or a service depends on one undocumented specialist.
Consequence in context
High over time
Evidence to retain
Retain the local observation, control test and responsible reviewer’s decision.
Stop or escalation trigger
Hold the next funding release if a promised role or handover has no evidence.

OECD and IDB, Caribbean Development Dynamics 2026

R15Foreign provider dependency defeats an exitA supplier exit test cannot restore usable records or keep the service available.The operator could face lost records, service disruption or unplanned switching costs.Cross-sector
Regional example
Regional / structural
Procurement authority

Retain portable exports, document dependencies and compare a priced fallback.

Evidence and stop trigger
Assessment basis
Check contract terms and test export and restoration. Vendor assurance alone is insufficient.
Warning sign
A live drill cannot recover usable records or continue the service without the vendor.
Consequence in context
High for essential services
Evidence to retain
Retain the local observation, control test and responsible reviewer’s decision.
Stop or escalation trigger
Keep the existing route and delay award or expansion until the fallback works.

CTU Caribbean AI Task Force final report

R16Political or supplier pressure distorts public decisionsPolitical or supplier influence changes an eligibility rule, tender or access decision outside the approved process.People could lose fair access and the reasons for the decision could become hard to trace.Cross-sector
Regional example
Regional / structural
Public procurement chair

Write criteria in advance, disclose interests and record reasons with lawful redaction.

Evidence and stop trigger
Assessment basis
Use procurement records, declared interests and independently verified accounts of incidents. Do not infer misconduct from nationality.
Warning sign
An unexplained change in tender terms, service rules or source access bypasses the authorised process.
Consequence in context
High
Evidence to retain
Retain the local observation, control test and responsible reviewer’s decision.
Stop or escalation trigger
Freeze the affected decision and refer it to independent local oversight.

UNESCO Recommendation on the Ethics of AI

R17Concentration weakens local economic and policy choicesSeveral organisations adopt one underlying provider and find they cannot use an independent alternative.Shared outages and switching costs could limit choice across the region.Cross-sector
Regional example
Systemic
National finance and digital leads

Share approved evidence across countries; reserve local approval and record which costs and capabilities stay local.

Evidence and stop trigger
Assessment basis
Map shared providers and the actual rights to exit. Scenario impact is not probability.
Warning sign
Multiple governments depend on one underlying supplier or common identity service and lack an independent fallback.
Consequence in context
Very high if several jurisdictions lose service or bargaining options
Evidence to retain
Retain the local observation, control test and responsible reviewer’s decision.
Stop or escalation trigger
Defer joint expansion until an independent alternative or safe manual route has been demonstrated.

CTU Caribbean AI Task Force final report

R18Severe failure spreads across essential servicesA failure in a shared identity, data or hosting service interrupts several essential services.Separate operators could lose service at the same time and compete for limited recovery capacity.Cross-sector
Regional example
Systemic
National incident coordination lead

Run a joint continuity drill and name a decision-maker in each service.

Evidence and stop trigger
Assessment basis
Use joint drills, incident evidence and dependency maps. Size of disruption does not give its odds.
Warning sign
Separate services fail together during a drill, or a supplier cannot explain a serious control breach.
Consequence in context
Catastrophic in a defined multi-service scenario
Evidence to retain
Retain the local observation, control test and responsible reviewer’s decision.
Stop or escalation trigger
Limit or suspend the shared component and activate essential-service fallback.

NIST AI Risk Management Framework 1.0

R19Advanced systems could escape effective oversightAn advanced system continues consequential actions after operators lose reliable oversight or the ability to stop it.Harm could grow across affected services while operators work to regain control.Cross-sector
Regional example
Frontier uncertainty
National oversight authority or designated public sponsor

Use independent evaluation, narrow authority and documented human stop controls before any consequential use.

Evidence and stop trigger
Assessment basis
No reliable probability is established. The February 2026 report found early signs of relevant capabilities, below the level it judged sufficient for loss of control in the systems it reviewed.
Warning sign
A supplier cannot independently verify control over consequential access or explain a material failure.
Consequence in context
Potentially catastrophic. The February 2026 report discusses human extinction as a debated extreme outcome.
Evidence to retain
Retain the local observation, control test and responsible reviewer’s decision.
Stop or escalation trigger
Do not widen consequential access if independent checks fail or a credible stop cannot be tested.

International AI Safety Report, February 2026

R20Negation lost in a referral draftA draft referral changes a negative finding into a positive finding and could alter the care queue.A qualified team could put a patient in the wrong care queue.Health and clinical care
Sector example
Operational
Clinical safety lead

A qualified reviewer compares each consequential statement with the signed source before sending it.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Matched referral and source records containing negation and amended findings.
Stop or escalation trigger
A draft could change the clinical meaning before the reviewer intervenes.

WHO regulatory considerations on AI for health

R21Result units change during transferA reading is copied into a clinical note with a different unit or reference interval.The receiving team could interpret a result against the wrong clinical threshold.Health and clinical care
Sector example
Operational
Clinical safety lead

Display the original result and unit beside the draft and have authorised staff resolve every mismatch.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
A closed set of results with different units and a reviewer’s reconciliation.
Stop or escalation trigger
An unverified unit or reference interval reaches a decision record.

WHO regulatory considerations on AI for health

R22A delayed correction fails to reach the next teamThe source record changes and an earlier summary remains in the handover queue.A later decision could rely on a finding the source team already corrected.Health and clinical care
Sector example
Operational
Clinical records lead

Attach record version and time to summaries and recall every affected copy after a material correction.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
A simulated amended note and reconciliation of the downstream copies.
Stop or escalation trigger
A team could act on a superseded clinical statement.

WHO regulatory considerations on AI for health

R23A translated instruction changes the type of appointmentA text prepared in the patient’s preferred language reverses whether they should attend in person.A patient could miss an appointment or travel unnecessarily.Health and clinical care
Sector example
Operational
Clinic operations lead

Have authorised staff and a competent speaker check the original and translated actions on matched cases.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Source notices, repeat-back results and a dated translation review.
Stop or escalation trigger
A patient could miss or delay access because the channel or time changed.

WHO regulatory considerations on AI for health

R24A documentation trial consumes urgent review timeA typing aid saves drafting time and creates a review backlog that delays urgent cases.Urgent work could wait longer than the agreed clinical limit.Health and clinical care
Sector example
Facility / community
Clinical service director

Measure the whole pathway including corrections and keep urgent work in the staffed priority queue.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Elapsed time for urgent and routine cases with and without the tool.
Stop or escalation trigger
Urgent cases breach the agreed clinical service limit during the trial.

WHO regulatory considerations on AI for health

R25Late data make a parish appear quietA dashboard labels a district low priority after reports from a local clinic arrive late.A district that needs attention could be skipped when resources are assigned.Public health and disability access
Sector example
Facility / community
Surveillance lead

Show reporting completeness by district and require a duty officer to examine flagged missing returns.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Dated submissions, source completeness and decisions on withheld charts.
Stop or escalation trigger
A missing return can be displayed as a measured zero.

WHO regulatory considerations on AI for health

R26A chart carries instructions that a screen reader skipsAn emergency information graphic includes action text with no accessible equivalent.A resident using a screen reader could miss an essential instruction.Public health and disability access
Sector example
Facility / community
Public communications lead

Provide a text and staffed route and have affected users complete the same task on each route.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Accessibility test record and completed actions by channel.
Stop or escalation trigger
The critical instructions are unavailable on the agreed accessible route.

W3C Web Content Accessibility Guidelines 2.2

R27Small-area numbers identify a patientA summary combines a location and rare condition with other fields a reader can use to identify someone.A reader could link a sensitive condition to an identifiable person.Public health and disability access
Sector example
Facility / community
Disclosure review lead

Use a qualified disclosure review before release, aggregate where appropriate and keep restricted records inside the service.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
A disclosure-control review of the exact combination of fields published.
Stop or escalation trigger
An individual could be identified by combining the released fields.

WHO regulatory considerations on AI for health

R28A help channel mistakes an accessibility request for refusalA public enrolment interface treats a request for an interpreter as an abandoned or rejected application.An applicant could lose a deadline, place in the queue or entitlement.Public health and disability access
Sector example
Operational
Disability access lead

Let users choose a staffed route while preserving the original application date.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
A witnessed test with users who request several forms of assistance.
Stop or escalation trigger
A request for help could cause a loss of entitlement or deadline.

W3C Web Content Accessibility Guidelines 2.2

R29A resource summary uses an expired clinic capacity reportA public directory directs someone to a site whose operating hours or capacity has changed.A resident could spend time and money travelling to an unavailable service.Public health and disability access
Sector example
Facility / community
Public health operations lead

Date each source and provide an authorised way for clinic staff to correct availability across channels.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
A comparison between published availability, current clinic record and correction times.
Stop or escalation trigger
A person could be sent to a closed or unavailable service.

WHO regulatory considerations on AI for health

R30A marking aid mistakes a dialect for a wrong answerA grader lowers an otherwise correct answer because a local phrasing differs from the examples it expects.A pupil could receive a lower grade for using an accepted language variety.Education and research
Sector example
Operational
Assessment lead

Accept locally supported variants and require teacher review before recorded grades change.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
A double-marked sample by language variety, with adjudication reasons.
Stop or escalation trigger
An incorrect automated grade can enter the official record.

UNESCO guidance for generative AI in education and research

R31A research summary cites an article that cannot be locatedA generated background section presents fabricated or mismatched citations as evidence.A research decision or publication could rely on a finding with no traceable source.Education and research
Sector example
Operational
Research integrity lead

Open each cited work and trace the claim to a page, table or result before circulating the paper.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
A claim-to-source log and record of withdrawn citations.
Stop or escalation trigger
A central conclusion depends on an unverified source.

UNESCO guidance for generative AI in education and research

R32A recorded learning need moves outside the authorised school teamA tutoring report includes a support need that a supplier or external group is not authorised to receive.An unauthorised recipient could learn a pupil’s learning support needs.Education and research
Sector example
Operational
School administrator

Use the school’s approved records route and omit identifiers from tool trials.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
A permission record and test of the actual output recipients.
Stop or escalation trigger
A pupil’s identifiable record can reach an unapproved recipient.

UNICEF guidance on AI and children

R33An online-only task excludes learners with intermittent accessA new assessment depends on online assistance and students with weak access cannot show their work.A learner could lose marks or miss a submission because of unreliable access.Education and research
Sector example
Operational
Teacher or course coordinator

Compare equivalent offline and online tasks and keep an independently approved submission route.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Completion and reasons for missing work by submission channel.
Stop or escalation trigger
The online requirement could change an assessment for a student who cannot connect.

UNESCO guidance for generative AI in education and research

R34A model comparison reuses its test examples for tuningThe same examples guide revisions and appear in the score used to justify performance.Reported performance could overstate how well the tool works on new cases.Education and research
Sector example
Operational
Research data steward

Freeze a separate test set and document data lineage and review exceptions before submitting a result.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Versioned data split, test protocol and researcher’s reproduction log.
Stop or escalation trigger
Claims of performance depend on cases that informed model selection.

NIST AI Risk Management Framework

R35A postcode substitutes for income evidenceA screening aid uses location as a proxy when a borrower has incomplete address or income records.A borrower could receive worse terms or lose credit without a sound reason.Finance and insurance
Sector example
Operational
Credit policy lead

Test alternative records and require a reasoned staff decision before a decline.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Matched applications including missing address fields, with approvals and corrections by group where lawful.
Stop or escalation trigger
An unsupported location inference causes a refusal or worse terms.

IAIS application paper on supervising AI in insurance

R36A claim is assessed under the wrong contract editionA tool retrieves today’s wording for a loss governed by an earlier policy.A claimant could face an incorrect refusal, payment or delay.Finance and insurance
Sector example
Operational
Claims supervisor

Compare coverage with the dated policy in force for the case and require the handler to attest the source.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Claims spanning renewals and attachments, with the policy edition checked on each.
Stop or escalation trigger
A customer notice relies on a contract that does not govern the claim.

IAIS application paper on supervising AI in insurance

R37A similar name freezes the wrong accountA triage flag links a customer with a different person and moves the case towards a restriction.A customer could lose legitimate access to funds while the firm corrects the match.Finance and insurance
Sector example
Operational
Financial crime review lead

Require approved identity evidence and an authorised reviewer before an adverse action.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Paired name matches, decisions, error rates and time to correction.
Stop or escalation trigger
An unverified name match can block access to funds.

IAIS application paper on supervising AI in insurance

R38A quote uses a rate from the wrong market or currencyA summary mixes product rates across markets and an applicant treats it as a binding quote.A customer could commit to a price or currency the provider cannot honour.Finance and insurance
Sector example
Operational
Product and conduct lead

Show dated rate source, market, currency and the approval status before issuing a quote.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Cases with similar product names, different rate dates and currencies.
Stop or escalation trigger
A customer could accept a price based on an unapproved rate.

IAIS application paper on supervising AI in insurance

R39Shared vendor failure blocks several claims channelsA cloud or identity dependency used by multiple financial firms fails during a surge in claims.Claimants could have trouble submitting urgent claims or tracking whether requests were received.Finance and insurance
Sector example
Systemic
Continuity lead

Rehearse an independent intake route and restore sample claims without sharing applicant records across firms.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
An authorised dependency inventory, timed recovery drill and count of reconciled requests.
Stop or escalation trigger
Claims cannot be filed or reconciled via the agreed independent route.

NIST AI Risk Management Framework

R40An unofficial election notice changes a polling instructionA generated message looks authoritative but states the wrong time, location or eligibility requirement.A voter could go to the wrong location or miss the time to vote.Public administration and justice
Sector example
Facility / community
Public information officer

Link public instructions to the electoral authority’s current notice and rehearse a correction across channels.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
The source notice, public copy and proof of correction at each channel.
Stop or escalation trigger
An unofficial or expired instruction may be mistaken for the current official notice.

EU AI Act official article explorer

R41A model treats missing records as grounds for refusing a benefitA case with incomplete data bypasses statutory review or the applicant’s opportunity to supply evidence.An eligible person could lose a benefit or time to provide evidence.Public administration and justice
Sector example
Operational
Benefits operations lead

Require a caseworker’s reason, notice and human reconsideration before adverse decisions.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Test cases with missing data, original and corrected decisions and acknowledgement times.
Stop or escalation trigger
A refusal can issue without the required record or appeal route.

Government of Canada automated decision-making guidance

R42A court date changes without passing through the official registerA scheduling draft blends dates for similar case numbers and tells someone to attend at the wrong time.A person could miss a hearing or face an avoidable procedural penalty.Public administration and justice
Sector example
Operational
Registry supervisor

Check notices against the authoritative docket and log each amended message and acknowledgement.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Paired docket and notice records with adjournments and case-number variants.
Stop or escalation trigger
A legally consequential notice cannot be traced to the current docket.

EU AI Act official article explorer

R43A biometric match is treated as identity evidence by itselfAn operator gives an automated match more authority than the local approval and independent record allow.An incorrect identity match could prompt a restriction or denial.Public administration and justice
Sector example
Facility / community
Authorising officer and rights reviewer

Require legal clearance, independent identity evidence and a review path for individuals before use.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Approved scope, subgroup evaluation where lawful and an independent error-handling rehearsal.
Stop or escalation trigger
A match can drive an adverse decision without legally sufficient evidence and human review.

EU AI Act official article explorer

R44A translation shortens the stated appeal periodA bilingual public notice gives a different deadline in one version.A person could lose time to challenge an adverse decision.Public administration and justice
Sector example
Operational
Appeals service lead

Have qualified reviewers compare all operative dates and provide a staffed correction channel.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Issued and corrected notices, reviewer signatures and affected case list.
Stop or escalation trigger
Any recipient could lose time to challenge a decision.

Government of Canada automated decision-making guidance

R45A public excerpt uses a voice beyond the agreed purposeMaterial cleared for archiving appears in a promotional work with a recognisable voice.A person’s voice could circulate in a use they did not authorise.Culture and creative rights
Sector example
Facility / community
Rights and licensing lead

Record distinct permission for excerpting, imitation, reuse and audience, and ask rights holders to review it.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Interview terms, approval for the exact excerpt and withdrawal evidence.
Stop or escalation trigger
An identifiable voice can go public outside the recorded permission.

WIPO traditional cultural expressions

R46An archive tool reveals a restricted ceremonyA search response summarises community material whose location or content custodians restrict.People outside the community could obtain restricted cultural information.Culture and creative rights
Sector example
Facility / community
Archive custodian

Use collection-level access permissions and have designated custodians review public results.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
A test set containing allowed and restricted material and reviewer disposition.
Stop or escalation trigger
A user with public access can obtain restricted substance or identifying details.

WIPO traditional cultural expressions

R47An export loses attribution metadataA distribution tool drops composer, performer or photographer credits from a revised asset.Creators could lose attribution or evidence needed to resolve a rights dispute.Culture and creative rights
Sector example
Operational
Production editor

Reconcile required credits and rights metadata before each publication and vendor handoff.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Original rights sheet, published files and a record of corrections.
Stop or escalation trigger
A release silently removes required attribution or ownership information.

WIPO traditional cultural expressions

R48A classifier suppresses a local expression as abusePeople who use an established cultural phrase lose access to a forum after automated moderation.Members of a language community could lose access or have their speech suppressed.Culture and creative rights
Sector example
Facility / community
Platform moderation lead

Have qualified reviewers check context, provide appeal and measure reinstatements by language where lawful.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Matched examples, appeals, decision explanations and correction time.
Stop or escalation trigger
The system cannot reinstate content promptly after a confirmed contextual error.

UNESCO Recommendation on the Ethics of AI

R49Generated visuals carry rights the buyer cannot transferA contractor supplies artwork for a use that its records or licences do not establish.A publisher could face a rights claim or have to withdraw material.Culture and creative rights
Sector example
Operational
Creative procurement lead

Check the rights chain and permitted distribution before using the asset, and keep a replacement route.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
A retained licensing record and approved media release.
Stop or escalation trigger
The required right for publication, reuse or assignment is unverified.

WIPO traditional cultural expressions

R50A cool-month model understates dry-season demandA cooling estimate uses normal temperatures and supply while restrictions apply during the dry period.Dry-period water supply could fall short for local users or the facility.Energy, water and data centres
Sector example
Facility / community
Facility water lead

Compare withdrawal, consumption and source limits under hot, dry conditions with utility review.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
A water balance and dated dry-period supply margin agreed by the responsible service.
Stop or escalation trigger
A project cannot show the source can meet the agreed demand and service limits.

IEA Energy and AI

R51A restart load falls outside the connection studyA facility asks for capacity on steady-state measurements and omits a coincident restart peak.A restart could strain the local connection or interrupt another service.Energy, water and data centres
Sector example
Facility / community
Utility liaison

Require study of restart and sustained operation at the site before agreeing a load.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
A utility-reviewed load profile with restart and seasonal cases.
Stop or escalation trigger
The proposed load cannot be reconciled with the approved site envelope.

IEA Energy and AI

R52A facility’s emissions ledger omits backup generationA review attributes energy to the grid and omits emergency generators or onsite fuel use.A project could understate its emissions and choose a design on incomplete evidence.Energy, water and data centres
Sector example
Facility / community
Environmental manager

Reconcile meter and fuel records by operating state before comparing alternatives.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Meter logs, fuel records and reported energy and emissions boundaries.
Stop or escalation trigger
A material source of use cannot be accounted for in the permit or report.

IEA Energy and AI

R53A replacement plan assumes disposal options that are unavailableEnd-of-life equipment accumulates when the planned recycler or exit route cannot take it.Old equipment could accumulate without a suitable storage or treatment route.Energy, water and data centres
Sector example
Facility / community
Facilities and waste lead

Verify approved storage, transport and treatment routes and budget their full cost.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Authorisations, inventory, vendor acknowledgement and a funded closure estimate.
Stop or escalation trigger
Retired equipment exceeds verified storage or treatment capacity.

IFC General Environmental, Health, and Safety Guidelines

R54An optimisation draft ignores a sensor outageA planned action uses a flat reading from a sensor that stopped updating.Operators could send work or release supply based on a reading that has stopped updating.Energy, water and data centres
Sector example
Facility / community
Water operations controller

Check the age and reasonableness of measurements and keep manual dispatch available.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Timed outage drill showing flagged readings, authorised corrections and recovery.
Stop or escalation trigger
A stale reading could affect a live water or power decision.

NIST AI Risk Management Framework

R55An AI crop advisory uses the wrong planting zoneA weather or soil recommendation applies records from a different district or season.A grower could spend money or commit a planting to unsuitable conditions.Agriculture and fisheries
Sector example
Facility / community
Extension service lead

Have a local extension officer validate site, conditions, crop and date before release.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Paired source observations, advisory and authorised field review.
Stop or escalation trigger
A grower could act on advice meant for another zone or season.

FAO guide to digital agricultural extension and advisory services

R56A message repeats an expired fishing boundaryA draft alert uses an earlier fishing zone or season after a competent authority updates it.Fishers could take a trip into a restricted area or during a closure.Agriculture and fisheries
Sector example
Facility / community
Fisheries information lead

Check current official map and dates and issue corrections on the same channels.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Versioned notice, boundary check and distribution record.
Stop or escalation trigger
A draft could send fishers into a closed area or season.

FAO Code of Conduct for Responsible Fisheries

R57A landing model compares incomparable catch weightsA tool merges landed whole fish and processed weights in one measure used for planning.An official statistic or cooperative settlement could use an incorrect total.Agriculture and fisheries
Sector example
Operational
Cooperative records lead

Record the unit and handling stage throughout collection and confirm anomalies with workers.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Matched receipts, unit definitions and corrected totals.
Stop or escalation trigger
A disputed weight could affect a settlement or official statistic.

FAO Code of Conduct for Responsible Fisheries

R58A precision irrigation suggestion omits salinityA model treats an available water source as usable without measurements that matter to the crop.Growers could use unsuitable water and damage soil or crops.Agriculture and fisheries
Sector example
Facility / community
Agricultural water adviser

Have the local agronomy and water teams check soil and source measurements before publishing advice.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
The source, measurements and reviewer’s recorded suitability decision.
Stop or escalation trigger
Water suitability remains unresolved when advice would affect live crops.

FAO guide to digital agricultural extension and advisory services

R59A photograph alone sends a disease alert to growersA classifier gives a confident label for a poorly observed crop symptom.A grower could face an avoidable restriction, treatment expense or lost sales.Agriculture and fisheries
Sector example
Facility / community
Biosecurity programme lead

Keep the result as a prompt for authorised review and confirm the observation before issuing a public instruction.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Dated photographs, authorised field evidence and false-alert review.
Stop or escalation trigger
An unverified label could trigger a public restriction or costly action.

FAO guide to digital agricultural extension and advisory services

R60An automated refund answer ignores a storm closureA booking assistant uses routine terms after an approved closure changes the conditions.A traveller could lose a refund available under the approved closure terms.Tourism, retail and small businesses
Sector example
Operational
Customer operations manager

Check the dated booking terms and closure policy and keep staffed refund review available.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Sample cases with different dates and cancellations, outcomes and correction time.
Stop or escalation trigger
A customer may lose a remedy because the assistant uses the wrong terms.

OECD AI Principles

R61A price recommendation moves the decimal or currencyA draft offer combines tax or currency information from different islands and is sent to guests or customers.A customer could accept an order at the wrong price or in the wrong currency.Tourism, retail and small businesses
Sector example
Operational
Pricing owner

Require staff approval with amount, market, currency and total shown together.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Paired quotes with duties, taxes and currencies across the scope in use.
Stop or escalation trigger
A wrong charge or currency can reach a customer’s order.

OECD AI Principles

R62A directory advertises an entrance a disabled guest cannot useA listing inherits generic accessibility text for a venue with different facilities.A guest could arrive and find the advertised entrance unusable.Tourism, retail and small businesses
Sector example
Operational
Accessibility and service lead

Verify access features with the operator and give guests a staffed verification route.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Venue confirmation and user tests of routes, contacts and alternatives.
Stop or escalation trigger
A specific advertised access route remains unverified or incorrect.

W3C Web Content Accessibility Guidelines 2.2

R63A ranking buries locally verified retailersA search assistant drops active independent shops because they lack records from a major booking or retail platform.Local retailers could lose discoverability or bookings for reasons unrelated to eligibility.Tourism, retail and small businesses
Sector example
Facility / community
Marketplace service owner

Audit eligibility by source and give businesses a way to correct their listing and challenge an exclusion.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
An audited list, exclusions by channel and date of reinstatement.
Stop or escalation trigger
The listing can claim full coverage while verified shops remain excluded.

OECD AI Principles

R64A store treats customer contact as consent for a campaignA marketing draft includes contacts collected for deliveries or receipts without checking the permitted purpose.Customers could receive marketing they did not authorise and face difficulty stopping it.Tourism, retail and small businesses
Sector example
Operational
Marketing and privacy lead

Verify the actual use permission and maintain an accessible withdrawal route before sending.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Dated source of permission, approved audience and a withdrawal test.
Stop or escalation trigger
The campaign can reach people whose permission for that use is missing.

UNESCO Recommendation on the Ethics of AI

R65A support summary treats a disputed identity step as completeA service tool clears a change request even though proof required by the carrier remains unresolved.A subscriber’s service or account could change before the carrier verifies authority.Telecommunications
Sector example
Operational
Subscriber services lead

Keep the validated identity and approval steps in the existing service flow and review exceptions.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
A controlled test including incomplete requests and evidence of authorised review.
Stop or escalation trigger
The tool can trigger a consequential account change before proof is checked.

NIST AI Risk Management Framework

R66An outage dashboard shows silence as restorationAn area with damaged links stops sending reports and the dashboard interprets the gap as restored service.A district could remain without service after responders stand down.Telecommunications
Sector example
Facility / community
Network continuity lead

Mark missing data, collect independent field reports and keep contested conditions visible.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Timestamped field reports, site status changes and staff decisions under loss of signal.
Stop or escalation trigger
Any unconfirmed outage can disappear from the operational view.

ITU National Emergency Telecommunication Plans

R67A corrected alert fails to reach a carrier channelAn authorised emergency update replaces a draft on one route while another channel still sends the original.Residents could act on an outdated emergency instruction.Telecommunications
Sector example
Facility / community
Emergency communications lead

Reconcile updates with authorised systems and measure the time to withdraw stale information.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
A carrier-by-channel drill record with delivery and correction timestamps.
Stop or escalation trigger
A superseded instruction remains active when people could rely on it.

ITU National Emergency Telecommunication Plans

R68A support classifier closes an accessibility grievanceA call transcript misclassifies a request from a customer who needs an alternative contact route.A customer could lose access to a remedy or a usable contact channel.Telecommunications
Sector example
Operational
Complaints service lead

Provide accessible channels and require a human check for possible unmet access needs.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Closure reasons, cases reopened and time to acknowledgement by channel.
Stop or escalation trigger
An unresolved accessibility complaint can close without a staffed route.

W3C Web Content Accessibility Guidelines 2.2

R69A network expansion plan treats call volume as population needPlanning data underweights places whose weak service yields few calls.An area with unmet demand could lose priority for network investment.Telecommunications
Sector example
Facility / community
Coverage programme lead

Compare recorded demand with field surveys and community reports before recommending investment.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Coverage evidence, offline reports and approved planning assumptions by locality.
Stop or escalation trigger
A site may be excluded only because poor connectivity reduced recorded activity.

ITU National Emergency Telecommunication Plans

R70A routing suggestion sends a vehicle towards a flooded crossingA route uses an old navigation layer after live authorities close a crossing.A driver and passengers could reach a hazardous crossing or lose time finding another route.Transport, logistics and disaster response
Sector example
Facility / community
Route operations lead

Confirm access with the authorised current source and maintain human dispatch on the emergency route.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Road status time, proposed and approved routes and correction test.
Stop or escalation trigger
A closed route remains available as an operational recommendation.

WMO Early Warnings for All

R71A cargo summary assigns the wrong inspection statusA draft combines records for similar shipments and reports a release that an authority has not cleared.Cargo could move before the responsible authority has cleared it.Transport, logistics and disaster response
Sector example
Operational
Port operations lead

Link to the authoritative record and require sign-off from the authorised officer.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Matched records including holds, corrections and signed releases.
Stop or escalation trigger
Cargo could move with an unresolved inspection status.

NIST AI Risk Management Framework

R72An aid directory routes residents to an unusable shelterThe model lists a site as open or accessible even though its current capacity or access has changed.A resident could travel during a hazard to a shelter they cannot use.Transport, logistics and disaster response
Sector example
Facility / community
Emergency shelter coordinator

Check current opening, routes and access with local coordinators and give a staffed route for corrections.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Timed checks with official status and a group that needs accessible transport.
Stop or escalation trigger
A safety-critical location or access instruction cannot be independently confirmed.

WMO Early Warnings for All

R73A transshipment estimate hides a missed handoffAn operator relies on a predicted load window that omits a confirmed delay at the next port.An operator could miss a connection or make a delivery promise it cannot keep.Transport, logistics and disaster response
Sector example
Facility / community
Freight operations lead

Use confirmed dates for decisions that affect commitments and escalate missing handoffs.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Operator confirmations, changed bookings and time the updated instructions reached customers.
Stop or escalation trigger
A firm delivery commitment can proceed without confirmation of the critical handoff.

NIST AI Risk Management Framework

R74A shared transport feed interrupts several warning routesAn authoritative transport feed fails and multiple islands’ tools continue circulating a stale answer.Several places could receive stale directions at the same time.Transport, logistics and disaster response
Sector example
Systemic
Regional continuity coordinator

Trace shared dependencies and test distinct fallback sources with each participating authority.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
A cross-site tabletop record, recovery times and the manual route each site verified.
Stop or escalation trigger
Participants cannot issue and correct essential directions independently.

WMO Early Warnings for All

R75A shift note marks an unresolved hazard as clearedA handover draft removes a warning because the prior note says a repair was planned.A crew could start work before an unresolved hazard has been corrected.Industry and workforce
Sector example
Operational
Safety supervisor

Have both shifts check unresolved hazards against the signed log before accepting the summary.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Comparison of source, approved handover and any mismatch reported by crews.
Stop or escalation trigger
An unverified clearance could guide work on a hazardous task.

IFC General Environmental, Health, and Safety Guidelines

R76A rota optimisation leaves the only trained worker unavailableA schedule reduces hours while omitting a competency or cover requirement for the shift.An operation could run without required skills or delay a shift until staff arrive.Industry and workforce
Sector example
Operational
Workforce planning lead

Require staffing and competency sign-off and check absence and surge cases.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Approved roster, qualifications by role and results from cover drills.
Stop or escalation trigger
A minimum approved competency or safety coverage cannot be met.

ILO review of generative AI and work organisation

R77A hiring tool filters applicants over a recorded accommodationA model treats a request for more time or another channel as weak performance.A qualified applicant could lose consideration because they requested access support.Industry and workforce
Sector example
Operational
People and employment lead

Review job relevance of each input and offer accessible human reconsideration before rejection.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
Matched applications, rule and reviewer records and time to remedy.
Stop or escalation trigger
An applicant can be excluded because they used an accommodation.

EU AI Act official article explorer

R78A score penalises work carried out away from the tracking toolA productivity model misses maintenance, training, or offline work and sends a misleading performance score to a manager.A worker could face an adverse decision based on incomplete observation of their duties.Industry and workforce
Sector example
Operational
Worker relations lead

Compare scores with the actual duties and have worker representatives review evidence and remedies.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
A task inventory, contested counts and corrected performance records.
Stop or escalation trigger
A personnel decision could rely on unobserved or incorrectly attributed work.

ILO review of generative AI and work organisation

R79A system update removes the manual sign-off routeAn update makes the authorised offline procedure unavailable when an industrial tool is down.An operator could lose the authorised way to approve critical work during an outage.Industry and workforce
Sector example
Facility / community
Operational continuity lead

Rehearse version changes and show that supervisors can complete critical approvals without the tool.

Evidence and stop trigger
Assessment basis
Use dated observations and a sample from the proposed service.
Evidence to retain
A verified rollback and comparison of required approvals before and after the update.
Stop or escalation trigger
A critical approval loses its authorised alternative route.

IFC General Environmental, Health, and Safety Guidelines

R80A ferry surge becomes a room forecastA visitor bulletin merges day trips and overnight stays and changes expected demand for guesthouses.A guesthouse could buy stock or schedule staff for bookings that do not follow.Tourism, retail and small businesses
Anguilla
Operational
Tourism statistics editor

Test a draft visitor bulletin on months when ferry excursions and overnight stays moved differently.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the dated tourism tables, visitor category for each sampled month and the editor’s corrections.
Stop or escalation trigger
Any advice to order stock or staff rooms depends on the wrong visitor category.

Anguilla Statistics Department, Tourism statistics

R81A lagoon map removes a use that fishers rely onA draft planning layer marks a surveyed area unused even though fishers or a field team supplied contrary observations.A planning decision could restrict a fishing use that field evidence would have identified.Agriculture and fisheries
Antigua and Barbuda
Operational
Proposed coastal planning lead and invited Barbudan reviewers

Compare an annotated lagoon map with a field visit before releasing a planning layer.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the marked map, dated field notes and disputed features reviewed with authorised Barbudan participants.
Stop or escalation trigger
The planning layer can leave the review team while a disputed use remains unmarked.

Ramsar Sites Information Service, Codrington Lagoon site record

R82A Papiamento notice sends someone to the wrong counterAn appointment message changes the time, location or documents that a resident needs.A resident could go to the wrong counter or miss the documents needed for an appointment.Public administration and justice
Aruba
Operational
Public service counter supervisor

Test Papiamento appointment messages with local service users.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the approved notice, bilingual repeat-back record and corrected message from the service desk.
Stop or escalation trigger
A participant follows the draft and would miss the appointment or bring the wrong document.

Statistics Netherlands, The Dutch Caribbean: Population

R83A Family Island relief map shows a closed dock as openA map combines an old photograph with a current alert and sends responders to a landing they cannot use.Responders could lose time or attempt to use an unsafe landing.Transport, logistics and disaster response
The Bahamas
Operational
Participating island emergency coordinator

Test a relief map on one Family Island using a paper copy and dated responder observations.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep marked paper maps, the dated responder report and the time a correction reached each channel.
Stop or escalation trigger
A blocked landing remains in the map issued for decisions.

IDB and ECLAC, Assessment of the Effects and Impacts of Hurricane Dorian in The Bahamas

R84A water forecast overlooks a leak reported by phoneA metered route appears stable because a call-centre report has not entered the forecast data.Operators could allocate water on a forecast that overlooks a known local loss.Energy, water and data centres
Barbados
Operational
Participating water operations manager

Run a shadow forecast on a metered water route without changing allocations.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep source times for the calls and meters, observed use, forecast errors and the dispatch supervisor’s decision.
Stop or escalation trigger
A known leak or unresolved reading could change a proposed allocation.

Barbados Water Authority, Climate Resilient South Coast Water Reclamation Project

R85A visitor assistant sends people to a reserve without permissionThe assistant recommends access that a reserve manager or community guide has withheld.Visitors could enter a site without permission and affect local managers or restricted areas.Tourism, retail and small businesses
Belize
Operational
Participating tourism office and site managers

Review a sample of suggested visitor stops with local guides and reserve managers.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the dated access terms, manager’s feedback and the withdrawn suggestion.
Stop or escalation trigger
The route remains available after its permissions fail review.

Belize Ministry of Tourism, National Sustainable Tourism Master Plan

R86A summary changes the currency of a financial commitmentAn AI summary mismatches a date, currency or term from a closed financial file.A reviewer or client could interpret the size or terms of a commitment incorrectly.Finance and insurance
Bermuda
Operational
Participating firm’s review lead

Run a blind comparison of AI summaries and reviewer notes on closed financial files.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the source clause and a blinded comparison with two authorised reviewers’ notes.
Stop or escalation trigger
An unsupported term survives review and could affect a decision or client communication.

Government of Bermuda, Bermuda’s Economic and Employment Drivers

R87A handoff between counters resets a filing dateAn application reaches the wrong office or loses its original timestamp when the case moves.An applicant could miss a deadline even though the first counter received the case on time.Public administration and justice
Bonaire
Operational
Participating service supervisors

Test a lost application moving between an island counter and an RCN unit.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the dated receipt, transfer log and receiving officer’s confirmation of the original time.
Stop or escalation trigger
The case may miss a deadline because either office cannot recover its original receipt.

Government of the Netherlands, Governance of Bonaire, St Eustatius and Saba

R88A clinic reminder requires travel to the wrong islandAn appointment draft picks the wrong facility because a clinic name occurs in more than one service list.A patient could pay for an avoidable journey or miss care.Health and clinical care
British Virgin Islands
Operational
Community clinic scheduling lead

Check appointment reminders with a clerk on each participating island.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the booking record, clerk check, corrected notice and any journey avoided.
Stop or escalation trigger
A wrong-island instruction could reach a patient.

BVI Health Services Authority, Community Health Services

R89An assistance application restarts on another channelAn online draft asks for evidence already received at a counter and the applicant loses their place.An applicant could have to refile or lose their place in the assistance queue.Public administration and justice
Cayman Islands
Operational
Financial assistance operations manager

Trial the same assistance case by email, at a counter and through the portal.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the original receipt, a matched cross-channel sample and the time to correct each case.
Stop or escalation trigger
A duplicate request or changed receipt could delay an eligible application.

Cayman Islands Government, Applying to the Department of Financial Assistance

R90A translated clinic reminder changes the appointment locationA reminder in Palenquero changes a place or time that a reviewer must check before delivery.A person could miss care or travel to the wrong clinic.Health and clinical care
Colombia
Operational
Clinic service manager and participating speakers

Test appointment reminders with Palenquero speakers before automated delivery.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the official appointment, consent for any recording and a repeat-back tally reviewed with willing speakers.
Stop or escalation trigger
A listener could travel to the wrong facility or miss care.

UNESCO, Cultural space of Palenque de San Basilio

R91A forest alert draws an inspection away from verified changeThe system promotes a clearing without dated observations to establish the location or event.Field staff could delay inspecting a change already confirmed elsewhere.Agriculture and fisheries
Costa Rica
Operational
Conservation-area coordinator and authorised local reviewers

Test forest alerts against dated field observations before assigning an inspection.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the dated observations, model alert and the outcome of independent site checks.
Stop or escalation trigger
An unresolved alert could displace an inspection of a confirmed change.

Costa Rican Tourism Board, Tortuguero National Park

R92Street images conceal housing damage on the insideA draft inspection list skips an Old Havana household whose report gives credible evidence of damage unseen from the road.A household reporting a credible hazard could wait longer for an inspection.Public administration and justice
Cuba
Operational
Local inspection supervisor and participating residents

Reconcile street photographs with household reports during a shadow trial in Old Havana.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the resident’s recorded report, the officer’s comparison and the revised inspection status.
Stop or escalation trigger
A resident with a reported hazard loses review priority based on images alone.

Gaceta Oficial No. 90, Law 149/2022, archived issue

R93A Papiamentu service answer changes the action requiredA proposed public service answer uses local wording fluently but tells a resident to take the wrong action.A resident could follow the wrong instruction or miss a service date.Public administration and justice
Curaçao
Operational
Public information editor and participating language reviewers

Test a Papiamentu service answer through initial request and correction.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the approved instruction, speaker review and correction as heard by the original caller.
Stop or escalation trigger
A resident could miss a date or act on an incorrect place or instruction.

College bescherming persoonsgegevens Curaçao, Wetgeving

R94A remote damage assessment misses an affected farm assetA photo-based review marks an agricultural asset intact despite paired farmer and extension observations.A farmer could lose the chance to have a verified loss reviewed for recovery support.Agriculture and fisheries
Dominica
Operational
Participating agricultural extension supervisor

Compare remote assessments with paired farmer and extension-officer observations.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the dated images, observations from both reviewers and the revised recovery priority.
Stop or escalation trigger
The draft would remove a verified loss from the local review queue.

World Bank, Dominica Geothermal Risk Mitigation Project II

R95A tourism forecast applies national volume to local bookingsA forecast applies a region or unit that differs from the service operator’s actual market.An operator could buy supplies or assign staff against demand outside their market.Tourism, retail and small businesses
Dominican Republic
Operational
Participating operator and its booking supervisor

Check the units and geography behind local tourism forecasts.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the source geography, booking and cancellation records and the revised forecast.
Stop or escalation trigger
The forecast can drive a purchase or staffing commitment while the unit or area remains wrong.

Banco Central de la República Dominicana, tourism statistics

R96A reconstruction passes as a documented historical detailA classroom aid presents an inferred feature as part of the historical record.Pupils could learn an inference as fact and lose the distinction between evidence and reconstruction.Education and research
El Salvador
Operational
Participating teacher and heritage reviewer

Run a classroom test using labelled reconstructions of the same object.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the labelled illustrations, source record and student explanations reviewed by the teacher.
Stop or escalation trigger
Pupils receive a disputed reconstruction without a label that explains what is inferred.

Ministerio de Cultura, Joya de Cerén archaeological park

R97A clinic books an interior appointment a patient cannot reachThe booking assistant offers a time that conflicts with available transport from an interior community.A patient in an interior community could lose a time slot they have no route to reach.Health and clinical care
French Guiana
Operational
Participating booking supervisor and interior care-centre staff

Rebook a sample of interior appointments with the normal transport arrangements recorded.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the transport and appointment records, correction times and cases reviewed with local staff.
Stop or escalation trigger
A patient could lose access because the appointment cannot be reached by the available routes.

ARS Guyane and INSEE, Access to care across French Guiana, 2017

R98A storm assessment undercounts bearing treesA photograph-based estimate overlooks damage to bearing nutmeg or cocoa trees seen on inspection.Growers could have eligible losses omitted from a recovery decision.Agriculture and fisheries
Grenada
Operational
Participating extension officer and growers

Compare a sample of storm-damage estimates with inspections of bearing nutmeg and cocoa trees.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep paired field and image observations, including observed crop and corrected loss category.
Stop or escalation trigger
A verified loss could remain excluded from a recovery review.

Government of Grenada, Second National Communication, Carriacou marine protected area

R99A water notice gives the wrong service areaA notice confuses Marie-Galante with another service zone or repeats an instruction that expired.Households could plan around a water notice for another supply area or date.Energy, water and data centres
Guadeloupe
Operational
Local water-service desks and a participating municipal communications officer

Read sample water notices aloud to residents of Marie-Galante and the main islands.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the utility’s dated area notice, repeat-back results and the route for publishing a correction.
Stop or escalation trigger
An affected resident would receive the wrong zone, date or contact.

Météo-France Guadeloupe, Sargassum stranding forecast

R100A lesson mistranslates a step pupils need to followAn AI lesson changes an action in a language variety used by the class.Pupils could miss a learning step because the tool changed the action in their language.Education and research
Guatemala
Operational
Classroom teacher and participating language reviewer

Have pupils carry out locally reviewed instructions before distributing an AI lesson.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the approved instructions and observed completion counts by language variety without identifying pupils.
Stop or escalation trigger
A locally reviewed action cannot be understood consistently enough to use the lesson.

Government of Guatemala, National Day of Indigenous Languages

R101A forest alert changes a village decision before field reviewA remote change flag enters a village report while the location or apparent change remains disputed.A village could face a changed payment or public map before its authorised field review.Agriculture and fisheries
Guyana
Operational
Participating village reviewers and forest monitoring officer

Review a sample of remote change alerts with willing village representatives.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep dated observations, the village review record and the publication decision for each sampled flag.
Stop or escalation trigger
The flag can change a public map or payment before the authorised review.

Government of Guyana, Biennial Transparency Report, national forest monitoring system

R102A Kreyòl warning loses its location during a power cutA warning replay on radio or a staffed relay omits where the listener should act.A listener could take the correct action at an unsafe or unintended location.Transport, logistics and disaster response
Haiti
Operational
Participating local civil protection lead and radio editor

Run a short Haitian Creole warning drill with the power disconnected at the receiving site.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the source notice, outage-drill log and listeners’ repeat-back of place, time and action.
Stop or escalation trigger
A listener would act at the wrong place or the approved fallback cannot reach the test site.

World Meteorological Organization, CREWS Haiti support for the Hydrometeorological Unit

R103A reserve change alert mixes observations from different datesA draft layer pairs unsuitable image dates and labels seasonal variation as unauthorised change.A disputed satellite alert could cause the wrong site to be inspected or restricted.Agriculture and fisheries
Honduras
Operational
Reserve monitoring lead and participating community reviewers

Test change alerts using image pairs and authorised field observations.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep image dates, authorised site observations and dispositions of the alerts.
Stop or escalation trigger
An unverified location could trigger a restriction or inspection without field confirmation.

UNESCO World Heritage Centre, Río Plátano Biosphere Reserve

R104A spelling variation holds an eligible grant applicationAn intake assistant treats a name or place variant as a mismatch and stops routing the application for review.An eligible applicant could miss a grant deadline because the intake record was held.Public administration and justice
Jamaica
Operational
Grant programme manager, with an education liaison

Check a closed sample of grant applications with spelling variations before introducing automated sorting.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the grant rule, sample pairs, manual result and correction time by channel.
Stop or escalation trigger
A valid application could miss a deadline because an officer cannot see or reverse the hold.

Ministry of Labour and Social Security, PATH education grants

R105A catering buyer compares quantities that cannot be used alikeA school purchasing tool ranks a supplier using package size while ignoring usable quantity or a delivery cost.A school could pay more per serving or choose a supplier on an incorrect comparison.Tourism, retail and small businesses
Martinique
Operational
Participating school catering buyer

Reprice a school kitchen’s recurring basket from invoices and compare the assistant’s supplier ranking.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep actual invoices, a comparable cost calculation and the buyer’s reasons for any changed order.
Stop or escalation trigger
The ranking could change an order before a buyer resolves the unit or price mismatch.

INSEE, Food prices in Martinique and metropolitan France, 2022

R106A visitor assistant leaves out active small operatorsThe listing favours operators on one booking channel and suppresses verified businesses listed locally.An active operator could lose visibility or bookings despite meeting the listing rules.Tourism, retail and small businesses
Mexico
Operational
Participating municipal tourism office and operator panel

Audit which operators the visitor assistant leaves out.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the eligible operator list, exclusions by channel and the municipal reviewer’s corrected output.
Stop or escalation trigger
The assistant could be promoted as a complete listing while verified omissions remain.

INEGI, Quintana Roo economic census profile

R107A passenger notice inherits the terms for cargo serviceAn AI summary mixes the operator, service type or update time of two access notices.Passengers or freight users could follow the wrong timetable or service instructions.Transport, logistics and disaster response
Montserrat
Operational
Access information editor

Check a sample week of passenger and freight notices against their originating operators.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep originating notices, publication versions and timestamps for each channel that carries a correction.
Stop or escalation trigger
A notice could send a passenger or cargo operator to a service that no longer applies.

Government of Montserrat, Access and Connectivity

R108A fisheries record discloses restricted locations through an exportA reconciliation export exposes the coordinates of trap sites when only landed weights need to be shared.A supplier or reader could learn restricted fishing coordinates.Agriculture and fisheries
Nicaragua
Operational
Participating fisheries cooperative treasurer

Reconcile a landing without collecting location histories.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep a redacted receipt, dispute resolution record and a verified example of the exported fields.
Stop or escalation trigger
A supplier export contains a restricted location or obliges a member to disclose it to settle a dispute.

FAO, sustainable lobster fisheries on Nicaragua’s Caribbean coast

R109A provisional booking becomes a confirmed sailing noticeA forecast treats a slot as secured and the dispatcher’s notice goes to a customer before confirmation.A customer could act on a booking that the dispatcher cannot honour.Transport, logistics and disaster response
Panama
Operational
Participating freight dispatcher

Compare forecasts with actual bookings before sending a sailing notice.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the confirmed booking record, forecast timestamps and dispatcher corrections.
Stop or escalation trigger
An unconfirmed slot enters a binding customer instruction.

Panama Canal Authority, 2025 Sustainability Report

R110Two language versions ask for different documentsA municipal assistant gives different requirements or deadlines to Spanish-first and English readers.A resident could bring the wrong documents or miss a deadline because of the language version used.Public administration and justice
Puerto Rico
Operational
Participating municipal service manager and bilingual reviewers

Audit whether a municipal assistant gives the same appointment requirements in both languages.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep official dated requirements, matched test cases across languages and the corrected route.
Stop or escalation trigger
A person using either language could lose access or a filing deadline.

US Census Bureau, 2020 Census Language Program Operational Assessment

R111A Fort Bay cargo instruction survives a correction in an old threadA revised harbour notice goes live while an earlier instruction remains the answer in another channel.A cargo team could follow a superseded instruction and miss a handoff.Transport, logistics and disaster response
Saba
Operational
Harbour communications officer

Stage a Fort Bay cargo status change while an earlier copy remains in a message thread.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the change log, original and revised notices and the time each channel was corrected.
Stop or escalation trigger
A caller receives an expired instruction that could cause a missed handoff.

Public Entity Saba, Fort Bay pier access notice

R112A water estimate assumes production during planned maintenanceA forecast for a busy week fails to adjust supply when the operator expects a maintenance outage.Households could rely on a supply notice that omits planned downtime.Energy, water and data centres
Saint-Barthélemy
Operational
Participating water operations supervisor

Compare the water planner’s estimate during a busy week with a second run that includes planned maintenance.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep maintenance dates, two forecasts and the operations review of the revised notice.
Stop or escalation trigger
The model could issue a supply notice while the available production figure remains unresolved.

IEDOM, Saint-Barthélemy economic report 2022, water and sanitation

R113A shared allocation model merges two islands’ water recordsA model uses one island’s demand or asset readings to recommend an allocation on the other.An operator could allocate water using figures for the other island.Energy, water and data centres
Saint Kitts and Nevis
Operational
Participating water operations leads on each island

Run the same water-allocation exercise using two separately approved sets of local records.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep separately approved records and the result of each island’s manual review.
Stop or escalation trigger
A proposed allocation could change while the island or meter identifier remains disputed.

Ministry of Public Infrastructure, Why Desalination Matters for St. Kitts and Nevis

R114A radio notice changes the action although the place name is rightA practice notice directs a community to do something different from the authorised alert.Listeners could act at the correct place and still take the wrong safety action.Transport, logistics and disaster response
Saint Lucia
Operational
Community broadcaster and sponsoring service editor

Run a radio rehearsal on a dated practice notice with listeners from the named area.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the dated source, radio transcript and distinct counts for incorrect place and action.
Stop or escalation trigger
A listener could take the wrong action when the warning is repeated aloud.

Government of Saint Lucia, revised draft environmental and social impact assessment for Fond St Jacques and Saltibus, 2025

R115A school notice gives families different collection entrancesA changed collection time or gate appears in one language version and the old instruction remains in the other.Families could arrive at a different gate or time from the one the school can staff.Education and research
Saint-Martin (French part)
Operational
Participating headteacher and bilingual reviewer

Test one school collection notice in French and English with a change of entrance and time.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep both dated versions, repeat-back results and the clerk’s record of the correction.
Stop or escalation trigger
Families using either language could arrive at the wrong entrance or time.

French national education service for Saint-Barthélemy and Saint-Martin, bilingual class guidance, 2021–22

R116An inter-island appointment requires an impossible journeyA booking assistant assigns a slot without checking the boat or road connections a patient needs.A patient could lose their slot after the system offered no feasible journey.Health and clinical care
Saint Vincent and the Grenadines
Operational
Participating clinic scheduling supervisor

Test a booking that looks possible on the screen but requires an inter-island journey.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the appointment and journey options and record the replacement a staffed clinic confirmed.
Stop or escalation trigger
A patient could lose their slot because usable inter-island travel was omitted.

PAHO, Hurricane Beryl Situation Report 11, 29 July 2024

R117A release summary matches the wrong consigneeAn AI cargo record chooses a similar name and changes who can receive a shipment.Cargo could be released to the wrong party before the manifest is checked.Transport, logistics and disaster response
Sint Eustatius
Operational
Harbour supervisor and manifest clerk

Review a sample of cargo releases using both the harbour record and the original manifest.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the original manifest, the clerk’s match and the reason for holding or restoring an entry.
Stop or escalation trigger
A release could go ahead with an unresolved consignee or cargo record.

Public Entity Sint Eustatius, Harbour responsibilities

R118An earlier housing assessment hides a resident’s new evidenceAn AI summary preserves the earlier decision even after residents submit a credible correction.A resident could receive an adverse repair decision while their correction is still unreviewed.Public administration and justice
Sint Maarten
Operational
Participating housing recovery review lead

Compare repair assessments before and after residents add evidence.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the original file, dated submission and independent reviewer’s changed decision.
Stop or escalation trigger
An adverse repair decision could be made before the reviewer sees the new evidence.

Sint Maarten National Recovery Program Bureau, Home Repair Program

R119An assessment marks a correct local-language explanation wrongA marking aid confuses the language of a learner’s answer with their grasp of the concept.A pupil could lose credit for a correct explanation in a local language.Education and research
Suriname
Operational
Participating teacher and paid local language reviewer

Compare classroom feedback on the same science concept in Dutch and in a language selected by participating speakers.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep matched examples, lawful permission for retention and the paid reviewer’s adjudication.
Stop or escalation trigger
A correct explanation could lower a pupil’s grade or exclude them from a learning opportunity.

UNICEF Suriname, From Classroom to Differentiated Education programme evaluation, 2023

R120An archive permission for a recording reaches the wrong useA catalogue tool treats agreed preservation or listening as permission for a public excerpt or new reuse.A recording could be released or reused without the permission agreed with performers or custodians.Culture and creative rights
Trinidad and Tobago
Operational
Participating panyard representatives and archive curator

Run an archive permission test on a catalogue entry, a public excerpt and a request to reuse the recording.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the approved permissions for each use, credit and the confirmed withdrawal procedure.
Stop or escalation trigger
A recording or excerpt can leave the archive without permission for that use.

National Musical Instrument Act 2024, Act No. 13

R121An island staffing forecast pools unlike shiftsA tool recommends shift levels for an island using demand records from a different island or period.Operators could schedule too few workers for a busy island shift or incur avoidable call-in costs.Industry and workforce
Turks and Caicos Islands
Operational
Participating operators and staff representatives

Compare an island-level staffing forecast with completed shifts.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep forecast and completed shifts by island, the exceptions and staff representatives’ review.
Stop or escalation trigger
The forecast could assign too few workers for the agreed service or shift requirement.

Turks and Caicos Islands Statistics Authority, visitor arrival series

R122A ferry change reaches the web but misses the terminalTravel instructions disagree between the terminal and web channels after a departure changes.Passengers could follow an expired departure and miss transport.Transport, logistics and disaster response
US Virgin Islands
Operational
Participating operator and passenger information desk

Rehearse one changed ferry departure across the web and terminal channels.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep the operator’s notice, screenshots or dated signs and time to correction by channel.
Stop or escalation trigger
Passengers could follow a superseded departure after the operator has corrected the schedule.

US Bureau of Economic Analysis, US Virgin Islands GDP, 2022

R123A landing summary applies the wrong unit before a paymentA summary of sardine landings mixes units or duplicates a buyer’s weigh-in.Fishers or buyers could be paid the wrong amount before the landing records are reconciled.Agriculture and fisheries
Venezuela
Operational
Participating landing association and buyer representative

Reconcile a sample day of sardine landings before any payment changes.

Evidence and stop trigger
Assessment basis
Proposed local scenario. Check the observed rate and severity using the local test.
Evidence to retain
Keep signed weigh-in records, reconciled units and the parties’ disposition of disputed totals.
Stop or escalation trigger
A payment change could follow a disputed weight or unverified unit.

FAO, Venezuela fishery country profile

Glossary term

Full glossary